ASAS Thematic Network 1 st Workshop Rome April 28-30, 2003 AN OPERATOR’S POINT OF VIEW ASAS-TN - Rome, 2003 Background The High Level Group stated, at the end of their workshop in 2000, the following target:

jacob
Télécharger la présentation

ASAS-TN - Rome, 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASAS Thematic Network 1st Workshop Rome April 28-30, 2003 AN OPERATOR’S POINT OF VIEW ASAS-TN - Rome, 2003

  2. Background The High Level Group stated, at the end of their workshop in 2000, the following target: ”....the objective of this initiative is to create a single European sky based on an airspace and ATM system, designed, managed, and regulated in an armonized way to ensure efficient utilization of sky at European level for all users....” ASAS-TN - Rome, 2003

  3. Analysis • creation of a single European sky • creation of an organization able of managing an airspace and an ATM system • designed, managed, and regulated in a harmonised way • to ensure efficient utilization of sky ASAS-TN - Rome, 2003

  4. last but not least • to the benefit of all users ASAS-TN - Rome, 2003

  5. Four questions • Which technical choice do we need? • Which common direction do we want to take? • What is the time frame? • What are the benefits? ASAS-TN - Rome, 2003

  6. Human factor • The crew’s workload • An efficient operational scenario • The involvment of the airlines • The pilots and the pilots’ associations ASAS-TN - Rome, 2003

  7. Conclusions • ATM area should be user oriented • Sharing the costs • Tailoring the services to the need of airlines • Review the current en route charges ASAS-TN - Rome, 2003

  8. Conclusion If the airlines are satisfied with the result They will be positively oriented toward investing new resources! ASAS-TN - Rome, 2003