Geologic Web Services: Planning and Design
680 likes | 917 Vues
Geologic Web Services: Planning and Design. Sheena K. Beaverson. Introduction. Existing ISGS Map Services Project Planning Navigation Strategies Technical Nuts and Bolts Current Needs and Future Projects. Introduction. AXL Design Christopher McGarry MXD Design Antigone Dixon-Warren
Geologic Web Services: Planning and Design
E N D
Presentation Transcript
Geologic Web Services: Planning and Design Sheena K. Beaverson
Introduction • Existing ISGS Map Services • Project Planning • Navigation Strategies • Technical Nuts and Bolts • Current Needs and Future Projects
Introduction • AXL Design • Christopher McGarry • MXD Design • Antigone Dixon-Warren • Steven Gustison • Christopher Korose • Database Design • Alison Lecouris (Oracle) • Danial Nelson (ArcSDE) • Beta Testing – many project participants, management
Geologic Web Services Existing Map Services
Introduction • Illinois Digital Orthophoto quarter Quadrangles • File viewing and download • Released on-line June, 2001 • ArcIMS 3.0 • .axl file calling multiple image catalogs • Geography Network Challenge 3rd Place Winner • Access to over 4,100 data files • Data files contained within .zip file bundles
Existing Map Services • Illinois Historic Aerial Photographs • File viewing and download • Released on-line September, 2003 • ArcIMS 4.0, migrated to ArcIMS 4.0.1 • .axl file calling one image catalog (base imagery) • Access to over 8,100 data files (25 counties) • Additional 20 counties to be added • Imagery in MrSID format
Existing Map Services • Illinois Oil and Gas Resources • Released on-line February, 2004 • ArcIMS 4.0.1 and ArcMapServer 4.0.1 • .mxd file calling shapefiles, Arc/Info coverages, ArcSDE data layers • Access to over 180,000 wells in Illinois • Oracle data points • Over 83,000 well records reviewed and updated
Existing Map Services • Illinois Natural Gamma Ray Logs • To be released on-line June, 2004 • ArcIMS 4.0.1 and ArcMapServer 4.0.1 • .mxd file calling shapefiles • Access to about 350 individual logs
Existing Map Services • Illinois Water Wells • To be released on-line June, 2004 • ArcIMS 4.0.1 and ArcMapServer 4.0.1 • .mxd file calling ArcSDE data layers • Access to over 277,600 wells in Illinois • Oracle data points • No review of well records included
Existing Map Services • ISGS-IDOT Extranet • Not released publicly • ArcIMS 4.0.1 and ArcMapServer 4.0.1 on PC • Custom applications drive reporting of Preliminary Envronmental Site Assessments (PESAs) • MIDCARB – Midcontinent Interactive Digital Carbon Atlas and Relational dataBase • Multi-state map service served from Kansas
Geologic Web Services Project Planning
Project Planning • Data collection and assessment • Assemble data layers and assess data format • Modify data layers accordingly (migrate into SDE?) • Construct data sub-sets via query, identify table joins, add attributes for hyperlink field • Gather information on cartographic display • Existing paper maps, symbol sets, attribute information • Identify criteria to address confidential data points • Identify criteria to address homeland security concerns
Project Planning • Educate mapping team about differences between paper maps and cartographic maps • Scale dependant rendering • Limited viewing area • Screen real estate • Identify target audience • General public, K-12 students, college students • Field workers, drillers, exploration geologists • Internal staff or inter-agency team • (confidential data), screen proportions, fast internet connections • Internet, Intranet, Extranet
Project Planning • Identify modifications to template map service • Are software upgrades needed? • Have data storage routines changed significantly? • Are new base data layers now available? • Have instabilities emerged in original map service that can be readily addressed? • Initiation of a new project brings the temptation to upgrade existing map services. • Try not to be tempted by the dark side!
Project Planning • Meet with project staff to determine: • Must-have data layers • Possible additional data layers • Data display order – ‘the data stack’ • This is an iterative process • Avoid ‘what if I want…’ temptations • Can add additional data layers in the double digits range • Goal: guide web visitors to data quickly and logically
Project Planning • .mxd or .axl development Phase I • Add new base data, re-design display parameters • Add project-specific data layers • Review data stack with respect to emerging cartographic issues and complexities in symbology • Also an iterative process • Modifications to original plan by Technical staff • Preliminary feedback from mapping team
Project Planning • .mxd or .axl development Phase II • Program project-specific customizations • ArcIMSparam.js file arrays • Data field attribute display set and field aliasing • Enable hyperlink layers • Customized data layer labeling and added symbols • Customize html frames for web page display • Resist the temptation to initiate Phase II programming until after the data stack is finalized • Gives the impression of being ‘done’ far too soon
Project Planning • Phase I Beta testing, content assessment • Solicit comments from your mapping team on any feature of the map service and web display. • Font selection, size, display • Display and interaction of data layers • Data attribute labeling and order • Appropriateness of scale dependant data layer display • Completeness and usability of overall interface • This is the time to get nit-picky! • Have ‘everything and kitchen sink’ impulses won out? • Will our audience comprehend the story being presented?
Project Planning • Complete revisions from Phase I Beta testing • Phase II Beta testing, debugging • Solicit comments from your mapping team • Have editorial points been addressed? • Have we created new problems as a result? • Did we miss anything big in Phase I? • Solicit input from map service developers you know • If the buttons and navigation don’t make sense to them, how will a wider audience be able to use the map?
Project Planning • Development of support resources • Metadata for data layers and map service itself • Web pages to supply project information • Web page guide to interactive map components • Review of all web resources by editorial staff • Promote On-line release • Navigation How-To presentations to target audiences
Geologic Web Services Navigation Strategies
Navigation Strategies • Keep it simple • Web customers are familiar with browser tools • Web customers are unfamiliar with GIS tools • Using ESRI tool GIFs helps all interactive map developers educate new users • Complex data stacks can get confusing • ArcIMS to ArcMapServer to ArcSDE is a new setup • Limit web navigation to map service through one point
Geologic Web Services Technical Nuts and Bolts
Technical Nuts and Bolts • Production Server and Developmental Server • ArcIMS 4.0.1 UNIX machine, SunOS 5.8 • ArcMapServer 4.0.1 on PC • IDOT Extranet, other Developmental Servers • ArcIMS 4.0.1 on PC also with ArcMapServer 4.0.1
Technical Nuts and Bolts • Natural Gamma-Ray Logs Map Service • First map service designed on PC and ported to UNIX • Naming convention discrepancies • ArcIMSparam.js vs. arcimsparam.js • File content discrepancies • selFieldList: #ID# and #SHAPE# vs. #Id# and #Shape#
Technical Nuts and Bolts • Fix for ArcMapServer image naming issue after successful creation of map service with .mxd in administrator and website creation • navigate to the "javascript" directory • edit the javascript textfile "aimsXML.js: • a) find "function getURL" and "function getLegendURL". • b) directly above the line "return theURL;" add the code: • //* ISGS ArcMap Server fix added here • theURL = theURL.toLowerCase(); • //* end fix
The complete getURL functions should look like: • // get URL • function getURL(theReply) { • var theURL = ""; • var startpos = 0; • var endpos = 0; • var pos = theReply.indexOf("OUTPUT"); • if (pos != -1) { • theURL = getInsideString(theReply,'url="',dQuote,pos,0,false); • } • legendImage = getLegendURL(theReply); • //* ISGS ArcMap Server fix added here • theURL = theURL.toLowerCase(); • //* end fix • return theURL; • } • // getLegendURL
Technical Nuts and Bolts • Customizing the Toolbar Frame output • Show one tool per line • Insert table cell with tool description • Re-order tool selection • Insert blank table cells for logical spacing