1 / 21

Washington State Environmental Policy Act (SEPA)

Washington State Environmental Policy Act (SEPA). University of Washington Environmental Law and Regulation November 2009. Comparison of NEPA & SEPA. SEPA Policy (RCW 43.21C.020). To create and maintain conditions under which man and nature can exist in productive harmony; and

jacob
Télécharger la présentation

Washington State Environmental Policy Act (SEPA)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Washington State Environmental Policy Act (SEPA) University of Washington Environmental Law and Regulation November 2009

  2. Comparison of NEPA & SEPA

  3. SEPA Policy (RCW 43.21C.020) • To create and maintain conditions under which man and nature can exist in productive harmony; and • Fulfill the social, economic, and other requirements of present and future generations of Washington citizens • “Assure for all people of Washington safe, healthful, productive, and aesthetically and culturally pleasing surroundings” • “The legislature recognizes that each person has a fundamental and inalienable right to a healthful environment and that each person has a responsibility to contribute to the preservation and enhancement of the environment.”

  4. Judicial Elaboration of SEPA Policy • Polygon Corp. v. City of Seattle, 90 Wn.2d 59, 578 P.2d 1309 (1978) • SEPA sets forth a state policy of protection, restoration, and enhancement of the environment. RCW 43.21C.020 • Procedurally, the environmental protection policy is to be implemented by the preparation and circulation of an environmental impact statement disclosing the environmental impacts of the proposed action. RCW 43.21C.030(2)(c). • Reading SEPA as a purely procedure law “would thwart the policies it establishes and would render the provision that ‘environmental amenities and values will be given appropriate consideration in decision making’ a nullity. RCW 43.21C.030(2)(b).” • “It necessarily follows that SEPA confers substantive authority to the deciding agency to act on the basis of the impacts disclosed.”

  5. Judicial Elaboration of SEPA Policy (Continued) • However, since the 1980s at least five appellate courts have held that government required mitigation or denial exceeded SEPA authority • But, the Court of Appeals decision in the Victoria Tower II case upheld Seattle’s SEPA conditions since SEPA bestows broad powers and is to be given a vigorous construction

  6. Judicial Elaboration of SEPA Policy (Continued) • Required to Mitigate? Save a Valuable Environment (SAVE) v. City of Bothell, 89 Wn.2d 862, 870 – 71, 576 P.2d 401, 405 – 06 (1978) • “The action [to rezone 141 acres of farm land to permit construction of a major regional shopping center] was arbitrary and capricious in that it failed to serve the welfare of the community as a whole. Specifically, adverse environmental effects and potentially severe financial burdens on the affected community have been completely disregarded. If it is possible to substantially mitigate or avoid potential adverse environmental effects, and if Bothell takes the necessary steps to do so, responsible planning for the shopping center may be reasonable. It has not acted to avoid these consequences, however, and the rezone cannot be sustained. • “It is the policy of this state, expressed in the State Environmental Policy Act ‘that each person has a fundamental and inalienable right to a healthful environment . . .’ RCW 43.21C.020(3). This right has been threatened in the community directly affected by the environmental consequences of Bothell's zoning decision. The welfare of people living in this area must be served.”

  7. When is an EIS to be prepared?SEPA • The standard for when an EIS should be prepared is whether the proposal is "a major action significantly affecting the quality of the environment ...." RCW 43.21C.030(2)(c) • An EIS must be prepared “whenever more than an moderate effect on the environment is a reasonable probability.” Norway Hill Preservation and Protection Association v. King County Council, 87 Wn.2d 267, 278, 552 P.2d 674, 680 (1976) • Cannot offset negative impacts with the positive impacts. WAC 197-11-330(5); King County v. Boundary Review Board

  8. When is an EIS to be prepared?SEPA (Continued) • In close cases courts tend to require preparation of an EIS • Courts are not inclined to require an EIS where: • There will be no environmental impact without a subsequent action that is subject to SEPA, and • The action does not imply a commitment to a later action likely to have environmental consequences • For rezones, significance tends to be based on the differences in allowed intensity between the existing and proposed zoning and whether there is a specific proposal • For development permits courts seem to focus on • Intensity and irrevocability of the proposed development • Vulnerability of the site and surroundings

  9. When is an EIS to be prepared?SEPA (Continued) • Shoreline substantial development permits usually require an EIS given the SMA policy • Courts review the threshold decision using the arbitrary or capricious standard: • Willful and unreasonable action without consideration and in disregard of facts and circumstances • If there is room for two opinions, it is not arbitrary or capricious • In Norway Hill the Washington Supreme Court also held that the clearly erroneous standard is also used • Firm and definite conviction a mistake has been made • Taking SEPA’s policy into account

  10. SEPA Categorical Exemptions • Statutory exemptions in RCW 43.21C.035 through 0384 for certain irrigation projects, school closures, annexations, fish habitat restoration, air operating permits, water waste discharge permits for existing dischargers, and others • Administrative exemptions in Part Nine of SEPA Rules • Administrative exemptions cannot include “major actions significantly affecting the quality of the environment.” RCW 43.21C.110(1)(a) • Include optional flexible thresholds [WAC 197-11-800(1)] • From 4 to 20 dwelling units • From 10,000 to 30,000 sq. ft. agricultural buildings • 20 to 40 car parking lots • From 100 to 500 cubic yard landfills or excavations

  11. Process for SEPA Threshold Determination • If not categorically exempt, applicant or agency proposing action prepares a SEPA Checklist • Based on applicant’s own knowledge and observations • Normally to be prepared by applicant with agency assistance • However, not uncommon for a consultant to prepare a checklist • Independently reviewed by the lead agency. WAC 197-11-335 provides that If the lead agency determines the checklist does not provide reasonably sufficient information to evaluate the proposal, • The lead agency must either obtain additional information or • Defer the threshold determination • The needed information may be provided by the applicant, the lead agency, or consultation with agencies with jurisdiction or environmental expertise

  12. Process for SEPA Threshold Determination (Continued) • Responsible Official makes the threshold determination • Determination of Nonsignificance, no EIS required • Mitigated Determination of Nonsignificance (DNS), no EIS required due to mitigating conditions • Determination of Significance (DS) and Scoping Notice, EIS is required • Notice is required for DNSs for certain types of development such as those where another agency has jurisdiction and clearing or grading permits

  13. SEPA Mitigated Determinations of Nonsignificance • Provided for in WAC 197-11-350 • Applicant may modify proposal so that it is not "a major action significantly affecting the quality of the environment ....“ • Or the lead agency can require conditions to meet the same standard • Since 1989’s West 514 decision, there has been a judicial trend not to overturn MDNSs

  14. SEPA EIS Requirements • WAC 197-11- 430 -- 443 • Fact Sheet including the planned date of the final action • Table of Contents • Summary of the contents • Alternatives including the proposed action • Must evaluate the no-action alternative and compare it to the other alternatives • Must include reasonable alternatives • Reasonable alternatives include actions that could feasibly attain or approximate a proposal’s objectives, but at a lower environmental cost or a decreased level of environmental degradation • The lead agency may limit reasonable alternatives to those over which an agency with jurisdiction has authority to control impacts either directly, or indirectly through requirement of mitigation measures • In the Citizens Alliance case, the WA Supreme Court said that municipalities decide whether to review alternatives outside their jurisdiction

  15. SEPA EIS Requirements (Continued) • For private projects the lead agency may not be required analyze off site alternatives. This exemption does not apply to rezones unless the rezone is consistent with a comprehensive plan that has undergone SEPA review • A description of the affected environment, significant impacts, and mitigation measures • A succinct description of the principal features of the environment that would be affected or created • Describe the significant impacts on the built and natural environments • Clearly indicate mitigation measures that could be implemented or might be required as well as those that agencies or applicants are committed to implement • Summarize significant impacts that cannot or will not be mitigated • The final EIS must include comment letters and responses

  16. Procedural Requirements for SEPA EISs • After the threshold determination, the lead agency issues the scoping notice. WAC 197-11- 408 • The lead agency shall narrow the scope of every EIS to the probable significant adverse impacts and reasonable alternatives, including mitigation measures • Must invite agencies, affected tribes, and the public to comment on the scope • Must allow comments for 21 days, unless expanded scoping is used

  17. Procedural Requirements for SEPA EISs (Continued) • EIS preparation. WAC 197-11-420 • Lead agency and responsible official responsible for compliance • EIS must be professionally prepared and with an interdisciplinary methodology • Must be readable • Draft EIS is issued for public comment. WAC 197-11-455 • Must be provided to each agency with jurisdiction or environmental expertise • Must give public notice. WAC 197-11-510 • Include in SEPA register • May hold a public hearing or when 50 people or two or more agencies request one • 30 day comment period, may be extended to 45 days • Issuance of Final EIS. WAC 197-11-455

  18. When is a SEPA EIS Adequate? • The Adequacy of an EIS is tested under the “rule of reason.” Citizens Alliance To Protect Our Wetlands v. City of Auburn, 126 Wn.2d 356, 361-362, 894 P.2d 1300, 1304 (1995) • In order for an EIS to be adequate under this rule, the EIS must present decision makers with a "reasonably thorough discussion of the significant aspects of the probable environmental consequences" of the agency's decision. Cheney, 87 Wn.2d at 344-45 [552 P.2d 184] (quoting Trout Unlimited v. Morton, 509 F.2d 1276, 1283 (9th Cir.1974)). • The rule of reason is "in large part a broad, flexible cost-effectiveness standard", in which the adequacy of an EIS is best determined "on a case-by-case basis guided by all of the policy and factual considerations reasonably related to SEPA's terse directives". R. Settle, [The Washington State Environmental Policy Act: A Legal and Policy Analysis] § 14(a)(i) [ (4th ed.1993) ]. • This court "must determine whether the environmental effects of the proposed action are sufficiently disclosed, discussed, and substantiated by supportive opinion and data." • The court does not rule on the wisdom of the proposed development but rather on whether the FEIS gave the decision maker sufficient information to make a reasoned decision

  19. When is a SEPA EIS Adequate?(Continued) • Remote and speculative impacts or alternatives need not be considered • Based on cost-effectiveness grounds. SWAP v. Okanogan County v. Okanogan County, 66 Wn. App. 439, 832 P.2d 503 (1992) • Professor William Rogers has observed a “rule of thumb” that in Washington “a statement, any statement, is more likely to withstand judicial review than a declaration of nonsignificance.” Rogers, The Washington Environmental Policy Act, 60 WASH. L. REV. 33, 50 (1984) • The appellant courts have addressed EIS adequacy in 14 cases, only three have found an EIS inadequate

  20. SEPA AppealsRCW 43.21C.060 – 080 & WAC 197-11- 680 • Appellant must exhaust administrative remedies before filing a judicial appeal • The agency or local government is not required to have a local appeal process • But they may • A SEPA appeal must be combined with an appeal of the substantive decision, except for an appeal of a DS • Agency or applicant may use a notice of action taken to set a final deadline for a SEPA judicial appeal, 21 days from the second publication of the notice

  21. Resources • Ecology’s SEPA website: http://www.ecy.wa.gov/programs/sea/sepa/e-review.html

More Related