1 / 14

Programmes of Measures & Standards Co-ordination Group Outcomes Workshop

Programmes of Measures & Standards Co-ordination Group Outcomes Workshop. SERBD – Advisory Council May 2008. POMS CG Workshop. Technical POMS Studies Nine technical POMS studies, On-site Wastewater Treatment Systems Forest and Water Freshwater Morphology

jacoba
Télécharger la présentation

Programmes of Measures & Standards Co-ordination Group Outcomes Workshop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Programmes of Measures & Standards Co-ordination Group Outcomes Workshop SERBD – Advisory Council May 2008

  2. POMS CG Workshop Technical POMS Studies Nine technical POMS studies, • On-site Wastewater Treatment Systems • Forest and Water • Freshwater Morphology • Municipal & Industrial Regulation • Dangerous Substances • Marine Morphology • Abstraction Pressures • Groundwater Risk from Diffuse Mobile Organics • Urban Pressures.

  3. POMS CG Workshop Pro Forma • Monitoring of water bodies – e.g. criteria used in RAT for freshwater morphological impacts. • Classification of water body status and establishing default objectives – e.g. environmental standards for river flow to maintain sustainable abstractions, environmental quality standards for relevant substances. • Setting objectives • What are the risks to achieving the default objective by 2015? • What will relevant basic measures contribute to objective? • How should relevant basic measures be modified/optimised? • With regard to new obligatory regulations/controls – what is the required scope? What thresholds are needed? • What types of additional supplementary measures are judged necessary for each pressure type to achieve the default objectives? • What is the technical feasibility of putting technical solutions in place to meet default objectives by 2015? If not by 2015, when will achievement be feasible? • What are the rough costs of putting the various technical solutions in place? • What is the combined impact of all identified measures likely to be on achieving objectives?

  4. POMS CG Workshop On-site Wastewater Treatment Systems • Amend Building Regulations • Implement targeted programme of inspection and enforcement • (applying codes of practice and other legislation) for both existing and new systems, • supported by risk mapping, • registration system and certification by qualified assessors. • Use the GIS risk mapping /decision support system to prioritise the locations to be targeted for work on inspections and maintenance and on assessment of new planning applications • Prepare a register of OSWTS and apply a database and action tracking system, with quality controlled certification of septic tank system functionality • Establish certified panel of experts for site investigation and certification of installed system • Grants for system upgrades.

  5. POMS CG Workshop Forest and Water • Forestry Act requirement to replant should be altered • Aerial Fertilisation regulations needs to be referenced into Forestry and Aerial Fertilisation Guidelines • Updating acid sensitive areas map and boundary conditions • Existing forestry- new Guidance for Harvesting of older forestry • Coup felling size • Timing of operations • Establishment of buffer zones • Guidance document for sensitive areas • Suite of 38 measures to be used for existing forested catchments will form basis of new guidance document

  6. POMS CG Workshop Freshwater Morphology • Licensing/authorisation system necessary • Morphology measures tool kit • Enhancement schemes for channelisation • Removal of barriers (identified by expert judgement) • Enhancement schemes for over-grazing (identified by expert judgement) • Voluntary initiatives – wetlands projects • Education campaigns

  7. POMS CG Workshop Municipal & Industrial Regulation • UWWT Regs and WWTP licensing • Regulations should be aligned with arrangements put in place to implement the requirements of the WFD • i.e. monitoring requirements in the UWWD Regs should refer to water bodies at risk • Management systems should be implemented and audited • The use of decision tools to inform planners and regulators i.e. SIMCAT

  8. POMS CG Workshop Dangerous Substances • IPPC, PPP and Dangerous Substances Regs – transposing EC leg • New EQS • License review • National Dangerous Substances Awareness Campaign – septic tank advise, support for environmentally friendly products, better labelling schemes • Effluent characterisation to investigate the treatment of dangerous substances in WWTP • Further investigations into leachate constitution and its treatment • Further study on background levels is also required • Continued Pesticide usage surveys – better access to DAFF databases

  9. POMS CG Workshop Marine Morphology • Complex legislative framework – recent transfers of responsibilities between government departments • ICZM • Good environmental practice guidance containing mitigation measures

  10. POMS CG Workshop Abstraction Pressures SW • Modern abstractions law - comprehensive abstraction register/planning structure (roles/responsibilities)/licensing program/thresholds for registration and licensing/thresholds for abstraction volume • Plumbing code for water conservation • Water charging? • Water conservation - residential/commercial/industrial/water re-use • Reduce unaccounted for water loss (leaks) • Rainwater harvesting • Alter abstraction timing • Conjunctive use of water resources • New storage tanks/reservoirs • Alternative sources (and infrastructure) • Restrict development GW • New legislation (e.g., Water Resources Act)

  11. POMS CG Workshop Groundwater Risk from Diffuse Mobile Organics • Registration/surveys/inventories – local authorities, national institutions, industry, golf courses • Reporting, auditing of sales and usage • Use and disposal of pesticides within Source Protection Zones • GW monitoring • Mapping of cropping patterns • Research: • Degradation rates in Irish soils • Bypass flow • Poorly productive aquifers

  12. POMS CG Workshop Urban Pressures Soft Measures: • Change design codes – design constraints, source protection zones, SUDS • Enforcement (staffing) • Complete qualitative status assessment • Work is needed to document and quantify urban pollution, involving: • Monitoring (existing, new) • Targeted studies (e.g., road runoff, SUDS, sewer exfiltration) Hard Measures: • Change infrastructure - rehabilitation/replacement needs are considerable • Long-term (decades) implementation

  13. POMS CG Workshop Other Supporting Studies: • High Status Sites • Water Balance Model & Flow Duration Curve Tool • Setting Chemical Water Quality Standards • Heavily Modified Water Bodies & Artificial Water Bodies • how does the study assist: • the technical work undertaken on pressures by the POMS studies • monitoring / classification / objective-setting

  14. POMS CG Workshop Outcomes • Outcomes report - all POMS studies to populate pro forma • This will feed into the Economics Study • Presentations circulated • Measures table - template structure and terms agreed and tables to be populated by all POMS studies • Many of the studies are recommending follow-up “actions” as well as measures • Risk assessment updates of Art 5 tests - table circulated, to be populated and decisions to be agreed at next POMS CG meeting • A database needs to be populated to assist with the plan development

More Related