1 / 13

Bill Lawson May 13-17, 2002

Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF). PRICE Cost Model. Bill Lawson May 13-17, 2002. PRICE Cost Model. PRICE H: Commercial Parametric Hardware Cost Modeling Tool Tool Heritage: DOD Globals: Labor Costs Inflation Engineering Environment Key Component Parameters:

jamesvsmith
Télécharger la présentation

Bill Lawson May 13-17, 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF) PRICE Cost Model Bill Lawson May 13-17, 2002

  2. PRICE Cost Model • PRICE H: Commercial Parametric Hardware Cost Modeling Tool • Tool Heritage: DOD • Globals: • Labor Costs • Inflation • Engineering Environment • Key Component Parameters: • Complexity Factors (Table driven from industry experience) • Quantity and Design Repeat • Composition (Structure, Electronic, Purchased, Cost Pass-through) • Design Maturity • Mass • Operating Platform (Unmanned Space – High Reliability) • Mechanical Reliability (Extreme in-service conditions – Temp Range) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  3. Top-Level Cost Model MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  4. Hub S/C Bus Model MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  5. Detector S/C Bus Model MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  6. Free-Flyer S/C Model MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  7. Expanded Model MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  8. PRICE Summary:Roll-up of all Spacecraft • Validation of “Grass-roots”? • SysEngr Grass-roots: $269.4M • PRICE Cost Model: $274.5M • PRICE estimate ~2% Higher MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  9. IMDC Cost Estimate(s) Summary:Hub S/C SysEngr PRICE Model MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  10. IMDC Cost Estimate(s) Summary:Detector S/C SysEngr PRICE Model HW Labor MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  11. IMDC Cost Estimate(s) Summary:Free-Flyer S/C (6) SysEngr PRICE Model HW Labor MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  12. MAXIM_PF_PRICEcost.xls Cost Estimate Summary . . . MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  13. MAXIM_PF_PRICEcost.xlsCost Estimate Details . . . MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

More Related