An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FAA Airport PavementTechnology Program • National Airport Pavement Test Facility, FAA William J. Hughes Technical Center, Atlantic City, New Jersey, U.S.A. • New PCC Test Items • Pavement Thickness Design Software • www.airporttech.tc.faa.gov 1

  2. New Concrete Mix Design • 5.2 MPa (750 psi) or lower flexural strength to maximize thickness and minimize tendency for corner cracking due to curl (minimum 4.1 MPa (600 psi)). • Final mix has 50 percent cement replacement with flyash. 2

  3. Single Test Slab Placement • Gain experience with high volume flyash mix placement and finishing. • Measure curling of cured slab. • Further refine instrument installation from that done in previous test strip. • Monitor procedures for test item curing and early age behavior. • Develop field curing methods. 3

  4. Placing Test Slab Finished Slab 4

  5. Field Curing of Slab, Beams and Cylinders • Soaker hoses • Burlap • Plastic • Automatic timer for water • Wet cure for 28 days 5

  6. 6

  7. 7

  8. Results from Test Slab • Experience in placing the high flyash concrete mix. • Instrumentation installation procedures satisfactory. • Low heat of hydration with fairly uniform temperature profile during first 24 hours. • Curling minimal during 28-day cure. • Curling significant after removal of burlap and during drying period. 8

  9. Remaining Plans for CC2 • Continue monitoring test slab behavior. • Place three concrete test items on 8 CBR subgrade. • One on grade (concrete placed by 1/30/04). • One on aggregate subbase (concrete placed by 1/30/04). • One on econocrete subbase (concrete placed by 3/12/04). • Subgrade and support placement complete. • Instrumentation complete and installed. 9

  10. CC2 Test Objectives • Compare life and performance for 4-wheel and 6-wheel traffic. • Compare life and performance for three different support conditions. • Obtain data on SCI versus repetitions to failure. • Compare interior and edge stresses. • Measure shrinking/warping. 10

  11. Tilling Subgrade Rolling Subgrade 11

  12. Forms for 20-Slab Test Item 12

  13. Placing Test Item Slabs in a Checker-Board Pattern 13

  14. Installing Strain Gages at Slab Center Strain Gages Installed at Slab Edge 14

  15. Pavement Software Products Ö Ö Ö Ö Ö Ö Ö *All checked programs available on www.airporttech.tc.faa.gov 15