PRICING DETAILS OF AMC WITH M/S GEE

PRICING DETAILS OF AMC WITH M/S GEE. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS. (RECOUPMENT NOT CONSIDERED). DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS FEP SPARES LUMPSUM CHARGES. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS. ROAD MAP FOR FINALISING AMC.

jania
Télécharger la présentation

PRICING DETAILS OF AMC WITH M/S GEE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRICING DETAILS OF AMC WITH M/S GEE

  2. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS (RECOUPMENT NOT CONSIDERED)

  3. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARSFEP SPARES LUMPSUM CHARGES

  4. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS

  5. ROAD MAP FOR FINALISING AMC • IN-PRINCIPLE APPROVAL ACCORDED BY SRPC BOARD – 6TH JUNE 2006 • DISCUSSIONS WITH GE REPRESENTATIVES – 15TH JUNE - 15TH OCT 2006 • TO BE PUT UP TO POWERGRID BOARD FOR APPROVAL. – BY 10TH NOV 2006 • MoU SIGNING WITH CONSTITUENTS – BY20TH NOV 2006 • AWARD OF CONTRACT TO M/S GE – BEFORE 30 TH NOV 2006

  6. AMC CONTRACT SCOPE • The Scope of work includes: • Comprehensive maintenance support both for Software and Hardware of SCADA/EMS system installed under SR ULDC scheme covering all control centers in SR (Sub-LDCs, SLDCs, RLDC). • Deployment of trained engineers at SRLDC and all SLDCs (one engineer at each location) • 24x7 support for all critical faults within 30 minutes • Service level agreement at assured availability (penalty in case assured availability is not maintained) • Well defined preventive maintenance schedule.

  7. PROBLEM SEVERITY LEVELS

  8. EMERGENCY SUPPORT RESPONSE TIMES

  9. 1 OF 2 RESPONSIBILITY MATRIX

  10. 2OF 2 RESPONSIBILITY MATRIX