1 / 26

Indian Power System – Institutional Framework

LONG TERM GROWTH STRATEGIES FOR POWERGRID BY K.Krishnakumar, S.K.Roy, T.Biswas, A.Patir, C.B.Samanta, A.K.Sharma (GMP –IIM , LUCKNOW). Indian Power System – Institutional Framework. Electricity is a concurrent subject

jara
Télécharger la présentation

Indian Power System – Institutional Framework

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LONG TERM GROWTHSTRATEGIES FOR POWERGRID BYK.Krishnakumar, S.K.Roy, T.Biswas, A.Patir, C.B.Samanta, A.K.Sharma(GMP –IIM , LUCKNOW)

  2. Indian Power System – Institutional Framework • Electricity is a concurrent subject • POWERGRID, the Central Transmission Utility (CTU) – responsible for Grid Management, wheeling of power of central generating utilities , inter-state Mega IPPs and any other agency desiring so. • SEBs/STUs are responsible for – • Wheeling of power from state generating units and state level IPPs. • Power distribution in the state. • Few private distribution agencies operates as bulk licensee viz, CESC, Reliance, Tata Electric, AECo etc.

  3. Evolution of Indian Power Grid • Phenomenal expansion since independence • Generation : 1349 MW 110,000 MW (in 1947) (in 2002) • Grid : Local grid – at the time of independence. State Grids – emerged in 1960s. Regional Grids – in 1970s. Five Regional Grids – Northern, Western, Southern, Eastern & North-eastern National Grid – under progress.

  4. POWERGRID, AREAS OF OPERATION • Construction of Transmission System and its Operation & Maintenance • POWERGRID as the Central Transmission Utility (CTU) – responsible for transmission of power of central generating utilities , inter-state Mega IPPs and any other agency desiring so. • Operation of RLDCs and Grid Management • Consultany in the areas of • Transmission System (Construction and O&M) • Power distribution • Information Technology • Executing 27 consultancy jobs worth cost of around 1200 cr. And consultation fee of 155 cr. • Telecom

  5. Track Record 1992-93 2002-03 Total Growth (%) Physical Growth No. of S/s 39 79 102 MVA capacity 13,200 44,834 240 Circuit kms 23,000 46,245 101 Inter-regional500 8,000 1500 transfer capacity(MW) Financial Growth (Rs crs.) Net profit 236 643 172 Turnover 634 2,533 300 No. of employees 5,725 6,923 21

  6. Indian Power Scenario – by 2011-12 • Projected Peak Demand – 1,57,000 MW (As per 16th EPS) • Capacity addition envisaged • in 10th Plan – 41,000 MW • in 11th Plan – 45,000 MW

  7. Objectives / Task Ahead • Development of Transmission System – commensurate with generation/ demand • Establishment of National Grid & its Operation/ Management • Efficient Operation / Maintenance to achieve maximum availability • Expansion of Consultancy Business • Economic use of existing infrastructure to Develop Telecom Business

  8. Challenges • Fund Mobilisation for planned growth • Arranging ROW • Forest Clearance in view of awareness in Public, involvement of NGOs , and concern of apex courts • Maintain leadership in transmission business in the new environment (regulatory regime/new electricity act) • Technical Upgradation to meet future requirements • Increase profitability • Exploration of avenues for consultancy business • Vendor Development to meet huge requirement of Materials and Erection activities • Maintain availability of Telecom System

  9. SWOT Analysis • Strength • Recognised as Miniratna Company • Proven Technical Expertise in Transmission System upto 800 KVAC & HVDC • Project Management right from concept to commissioning • Experienced work force in varied terrain all across the country • Expertise in design / Implementation of State of the art ULDC Projects • Proven Maintenance Practices using hot line & ERS • One of the largest / best Transmission utility in the world • Monopoly business & Govt. Protection • Won confidence of World Bank, ADB and other International Funding agencies. • Well defined quality policy & procedure ,Works & procurement Policy,developed web based Inspection system • Possess wide spread Infrastructure for diversification into other areas like Telecom

  10. SWOT analysis contd… Weakness • High Capital Investment in Projects and heavy dependence on debt financing • Investment approvals required from GOI • Lessor redundancy in the system • Mismatch in Generation Project and Trans. System adversely affect financial Strength • Limited Capability of indigenous manufacturers and construction agencies to cater to huge expansion envisaged • Ageing Transmission System and work force • Lack of Profit centre concept at regional level

  11. SWOT analysis contd • Opportunities • Technical expertise to fetch Consultancy business at National / International level • Existing Infrastructure for diversification into telecom • Venture into Distribution Area, vertical integration • Introduction of Private Sector participants to induct Financial resources

  12. SWOT analysis contd… • Threats • Poor health of Consumers(SEBs) • Uncertainty in addition of planned generating capacity • System susceptible to vagaries of Nature • Serious ROW Problems & growing Environment concern • Lack of commensurate long term Funds to meet Trans. Requirement • Erosion of Knowledge base due to greener pastures outside • Possibility of losing monopoly status in times to come and subsequent competition • Cost dependency on Exchange rate variation • Law & order Problem in NER/ J&K etc. • Working in Regulatory regime • Stiff competition in Telecom sector

  13. National Grid: Cost-benefit analysis Cost • Investment required  Rs. 23,000 crores Benefits • Reduction in capacity addition requirement by about 13000 MW--- hence saving on investment of Rs. 52,000 crore (due to peak time diversity and saving in spinning reserve) • Transmission highway would enable setting up of large size pit head stations having lower cost of energy • Savings on account of this –Rs. 9000 crores per annum . • In addition, Nation’s investment towards fuel transportation infrastructure could be avoided. • Better overall hydro-thermal mix • Very low for ER and WR ( ER – 15 : 85, WR - 17 : 83 ) – affecting grid operation • With National Grid, it would become 33 : 67 on all India basis. .

  14. Major Challenges & Perceived Solutions Mobilisation of Funds • Considerable investment required for creation of Transmission Infrastructure • Investment requirement in : US $ 16 billion (Rs. 76,000 Central transmission sector Cr.) (including National Grid) by the year 2011-12 • Investment by POWERGRID : US $ 12 billion (Rs. 56,000 Cr) • Investment by Private Sector : US $ 4 billion (Rs. 20,000 Cr)

  15. Attracting Private Sector Participation Mobilisation of Funds through two routes namely : Joint Venture Route (JV) • Project specific Shell company for obtaining statutory approvals to offer bankable projects to private sector • Proposed equity participation to the tune of 25% to 49% • Has already setup joint venture with Tata Power for specific transmission lines associated with Tala Hydro Electric project Independent Power Transmission Company Route (IPTC) • Selection of the promoter through two stages (RfQ & RfP) ICB based on Transmission Service Charges (TSC) • International consultant appointed under the technical assistance(TA) of ADB • Transmission licensee to establish the project under BOOT • Pilot projects being taken up

  16. Major Challenges & Perceived Solutions Realisation of Investment • Realisation of investment by POWERGRID is made from SEBs on fixed transmission charges basis. • As National Grid is planned on long term basis, its utilisation in initial period will be less ---- hence, transmission charges would be on higher side. SEBs generally reluctant to pay higher transmission charges --- due to their poor financial health. • Poor recovery can affect health of POWERGRID --- hence future development of transmission system. Perceived Solution:Special methodology need to be adopted for recovery of tr. charges of Transmission highways.

  17. Major Challenges & Perceived Solutions • National Grid to be established through Govt. support as basic infrastructure ---- similar to National Road Highways. • GOI can extend support in following way : • Alt-I : GOI provides funds, and POWERGRID execute the system on deposit work basis. • Realisation through rational tariff based on allocation of power. • Alt-II : GOI provides interest free loan to POWERGRID with extended repayment period --- so that tariff payable by SEBs would be reduced. • Alt-III : GOI provides fund for Equity portion ( 20% of cost). Balance to be arranged by POWERGRID through loan. • SEBs to pay fixed transmission charges for debt-servicing for initial period --- thereafter commercial charge.

  18. Major Challenges & Perceived Solutions Proper Load Despatch & Communication Facilities (ULDC) • Implementing/implemented ULDC schemes in all five regions with state-of-art- SCADA, EMS etc. comprising 3 hierarchical level • An investment to the tune of US $ 425 million (Rs. 2000 Cr.) • Achieved distinctive feat by implementing world’s largest ULDC scheme in Northern and Southern Region Establishment of National Load Despatch Centre (NLDC) by interconnecting all the regions. Integrated Grid Operation • Strict adherence to grid discipline for maintenance of voltage and frequency parameters in the desired range • Operation of generating units in free governor mode. • Implementation of “Availability Tariff” having provision of penalties and incentives to encourage grid discipline.

  19. Major Challenges & Perceived Solutions • For extending benefit to National Grid, development of sub-transmission and distribution is vital – responsibility lies with states. • POWERGRID, time-to-time undertakes critical state schemes – which are vital for entire grid. • To make distribution system effective and efficient – • 350 distribution circles all over the country are made profit centres • Total investment envisaged – US $ 10 billion • GOI launched Accelerated Power Development Program (APDP), with an outlay of Rs. 1000 crores in 2000-01. • Rs. 3500 Crore has been allocated for 2002-03. • Assigned responsibility develop 55 circles in 16 states as a role model and centre of profit under APDRP Scheme • Powergrid is implementing Sub-transmission system in Bihar, Goa and doing studies for states like UP, Rajasthan

  20. Major Challenges & Perceived Solutions Uncertainty in Generation Addition • Big gap between planned and actual generation addition programme. • Uncertainty more in private sector projects. • Development of optimal transmission plan hampered. Perceived Solution: Creation of tr. Highways from resource-rich pockets to load centres, without linking them to a particular generation project

  21. Major Challenges & Perceived Solutions Delay in Finalisation of Inter-regional Links There is invariable delay in finalisation/ clearance of inter-regional lines due to • Question on firm availability of surplus power on long-term basis • Commitment of firm allocation of power • Commitment of SEBs to pay transmission charges towards investment in inter-regional schemes

  22. Major Challenges & Percieved Solutions Environmental/Social Issues • Construct/maintain grid with least impact on environment . • Take all measures according to the guidelines issued by MOEF from time to time • Using high rise towers , multi-circuit towers and existing corridors to protectenvironment • To address the social aspect in a systemized manner POWERGRID developed Environment policy called –ESPP (Environmental social policy & Procedures) in consultation with WB / ADB / environment concerned agencies and covers Social economic survey, identification of PAPs, PAFs to finalise benefit schemes

  23. Conclusion To summarize we can put POWERGRID strategy in following way • Growth Strategy • Improve sources of revenue through consultancy business in the country (exploit unbundling era in SEBs) • Explore avenues in other developing countries and utilise its rich experience in the field of design / Project Management • Add sources of revenue by diversifying into Distribution area • Explore business in Quality/ Inspection area • Use of existing infrastructure for Telecom business • Customer Perspective • Solve customer problem through advice and consultation • Identify potential / Profitable customers • Help SEBs in developing infrastructure at distribution level, through consultancy/Forming Joint ventures • Help States during Crisis/ disaster

  24. Conclusion • Operational Strategy • Better Asset utilization by increasing capacity of existing infrastructure by Reconductoring /Sereis compensation / FACT/ Operation of lines at higher Temperatures etc. • Intensive use of IT effectively for areas like inventory/ surplus material management , Improve productivity of Human resources • Introduce reward / Penalty for performance by vendors in major schemes • Internal Process Perspective • Maintain relationship with MOP / MOF/ MOEF/CEA/ Multilateral Funding agencies etc. • Grow environment awareness in employees • Technological upgradation through innovations in design , construction and O&M techniques • Develop Inforamation & Knowledge management system • Minimise Cost / Time Over runs • Maintain Quality Standards in all areas • Introduce reward and penalty scheme to increase productivity

  25. Thank You

More Related