The meeting on 30 May 2008 addressed key topics related to the performance measures for wind-generating resource (WGR) QSEs, including discussion of Day-Ahead Resource plans and ramp rate limitations. Key outcomes included proposals for performance measures, legal interpretations of ERCOT protocols, and the importance of accurate scheduling in real-time operations. The group aims to develop metrics for LSL as a percentage of HSL and address the synchronization of resource plans. The next meeting is scheduled for 20 June 2008.

1 / 9

Télécharger la présentation

QSE Managers Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. QSE Managers Working Group 30 May, 2008 Meeting Notes Report to WMS 18 June, 2008

  2. 30 May, 2008 Meeting Agenda • DBES from Actual Output or Schedules • LSL as % of HSL Performance Measure • PRR-763 Use of WGRPP as Planned Operating Level in Day-Ahead Resource Plan for WGRs. • WGR Ramp Rate Limitations • QSE Resource Plan Update Timing

  3. DBES from Actual Output or Schedules • Discussion with ERCOT examples • In real time, schedules are considered irrelevant. ERCOT expected DBES from actual due to the Wind Only QSE’s almost always off schedule and the use of the offset. A better, more accurate schedule would limit the problem. • Next Step: Work on a performance measure.

  4. LSL as % of HSL Performance Measure • ERCOT request for legal interpretation of the protocols. They may be able to stop the practice of Wind QSEs entering LSL=HSL without a protocol revision. Not ready to share findings. Walter Reid suggest 10% of WGR rating as the LSL. There is support for a PRR (Protocol 4.10.4) • Next Step: Mark Bruce and David Detelich will propose PRR language. Down Balancing Bids from WGR QSEs would then be required.

  5. PRR-763 Use of WGRPP as Planned Operating Level in Day-Ahead Resource Plan for WGRs • No objection from a market perspective. ERCOT will email the P50 and P80 forecast hourly. IA – May have impact on QSEs. Can they meet a July 1 implementation date? • Next Step: Review the market bulletin that John Dumas is authoring. Provide ERCOT with an email address for each WGR. Complete telemetry for 57 sites.

  6. WGR Ramp Rate Limitations • John Dumas showed slide from the March 17th wind workshop. ERCOT and OWG suggested a 5% ramp rate. Agreement that uncontrolled ramping impacts the market with more regulation deployments and quantities required. No analysis, though. QMG could support a 10% ramp rate. Some still want an analysis. • Next Step: John Dumas to issue a PRR requiring a ramp rate limitation of 10%.

  7. QSE Resource Plan Update Timing • The resource plan for WGR only QSE’s should be kept in sync with the schedules. ERCOT’s process is to use the offset for the Wind SCE. • Include language in the Market Bulletin about this. Develop an appropriate Metric.

  8. Recap on issues to date • LSL as % of HSL Performance Measure ERCOT interpretation and/or a PRR • WGR Ramp Rate Limitations John Dumas to issue PRR • Wind QSE Resource Plan Update Timing QMWG to work with ERCOT to develop Bulletin • 50/50 forecast vs. 80/20 forecast  Withdrawn, unless significant changes • A/S Procurement During High Risk Periods Recommendations provided to ERCOT • Down Balancing Bids from WGR QSEs   Consolidated with Item #1 – LSL % of HSL • DBES from Actual Output or Schedules? Better Scheduling required. Metrics needed for WGR only QSE’s

  9. QMWG – Future Agenda Items • Metrics for WGR only QSE’s • Discuss development of types • LSL as % of HSL Performance Measure • Review of PRR and/or ERCOT Protocol Interpretation • WGR Ramp Rate Limitations • Review of PRR • Wind QSE Resource Plan Update Timing • Review of PRR, Market Bulletin • Next Meeting: 20 June, 2008.