1 / 2

Review

production of 30min calibrated SFTs well under way (see talks by V.Dergachev., X. Siemens in ASIS/DetChar). Also expect calibrated h(t) in the next 2 weeks. TDS of signals from known pulsars : changes wrt S1 analysis in: noise estimation phase evolution model for Crab

javan
Télécharger la présentation

Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. production of 30min calibrated SFTs well under way (see talks by V.Dergachev., X. Siemens in ASIS/DetChar). Also expect calibrated h(t) in the next 2 weeks. • TDS of signals from known pulsars: • changes wrt S1 analysis in: • noise estimation • phase evolution model for Crab • now reliable ULs for ~30 known pulsars • now preliminary ULs (correct within sqrt(2) for remaining 9 • All-sky, wide-frequency FDS, Tobs ~ ½ day: • changes wrt S1: • robust wide band noise estimation • event identification procedure • event shape test • all machinery is in place, need to run end-to-end pipeline on final data set and entire parameter space • GC, wide-frequency FDS, Tobs: entire run • will exploit ~ 1000 CPUs for 1 month (AEI, Birmingham, Caltech, Cardiff, ISI, UWM) • will begin next week at SC03 conference Review

  2. FDS of signals from ScoX1: • 40 Hz band will be searched, projected semi-major axis, initial phase, Tobs: ~ 9 hrs, loudest event • end-to-end pipeline already tested, will include a c2 test on candidates • expect results by the end of the year • Hough transform: • all-sky, 1 spin-down parameter search, Tobs: entire S2 run, loudest event • pipeline in place, including monte carlo injections for determining UL detection statistic • all machinery is in place, need to run end-to-end pipeline on final data set and entire parameter space • Stack-slide search: • debugging sliding • needs to develop UL inference scheme • might have final results by March • Unbiased search: • developed power statistic from 30 min SFTs • needs to develop UL inference scheme • might have final results by March

More Related