Regional System Planning

Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations ISO New England Inc. Regional System Planning. ISO New England’s role in the restructured electric industry Planning Horizon: 10 Years

Télécharger la présentation

Regional System Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Connecticut’s Energy FutureConnecticut Energy Advisory Board ConferenceHartford, ConnecticutDecember 2, 2004Kevin KirbyVice President, Market OperationsISO New England Inc.

  2. Regional System Planning • ISO New England’s role in the restructured electric industry • Planning Horizon: 10 Years • Geographic Scope: • New England • Connecticut, Southwest CT and Norwalk-Stamford sub-areas • Coordination with neighboring control areas • Regional Transmission Expansion Plan for 2004 What are the region’s energy needs today and through 2013?

  3. Long-term Planning • Long-term planning is important because: • Identifies areas of the system that are projected to have inadequate resources and/or reliability problems • Provides a timetable for when new resources need to be available • Signals where investment in energy infrastructure is most valuable • Short-term fixes are costly “The objective is to have a plan that adequately meets projected system and local needs.” (RTEP 04)

  4. 5,000 - 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 New England’s Capacity SituationToday’s surplus capacity situation will be short-lived 35,000 30,000 25,000 20,000 Summer Megawatts 15,000 10,000 Net Generating Capacity 90/10 Load + Operating Reserves 50/50 Load + Operating Reserves

  5. Winter Capacity Situation • January 14-16, 2004 ‘Cold Snap’ was coldest winter period in New England in 25 years • New England set an all-time winter peak: 22,878 MW • Electric and gas industry coordination is critical • Electric and gas market trading deadlines are not well aligned • Gas pipelines will not build infrastructure without long term contracts • Incremental gas supply into New England over the next 10 years expected to be liquefied natural gas (LNG) • Market incentives are needed to increase dual-fuel capability

  6. Winter 04/05 Improvements • Establishment of Electric & Gas Operations Committee • Weekly information sharing • Establishment of “Cold Snap” Operating Procedure triggering: • Cancellation of economic outages before cold weather arrives • Request for dual-fuel units to switch to secondary fuel • Advancement of electric system trading deadlines • Implementation of remedial actions by asset owners to improve availability during extreme weather • Improved ability to import power from New York • Improvements could provide approx. 3,000 to 4,000 MW of additional capacity for winter 2004/05 over last year.

  7. Major Concerns • Transmission investment lags • Transmission constraints have created load pockets • Threatens regional reliability • Certain resources are critical • Even with planned transmission upgrades, additional resources will be needed • Existing generation at risk • Fuel diversity

  8. Connecticut: Overview • Capacity is inadequate to serve demand and meet reliability requirements • Special measures (emergency resources and operating procedures) are needed to keep the lights on now in Southwest Connecticut • Existing generation is needed to provide bulk power system support • More than 2,800 MW projected to be operating under reliability agreements in 2005 • Connecticut incurs avoidable costs because of inadequate energy infrastructure

  9. 90/10 Peak Load + Reserves 50/50 Peak Load + Reserves Connecticut Capacity Situation 12,000 Emergency Actions 10,000 Southern New England Reinforcement 8,000 Summer Megawatts 6,000 Current Import Limit Net Generating Capacity 4,000 2,000 - NOTE: Transmission project in-service dates are subject to delay 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

  10. 6,000 5,000 90/10 Peak Load + Reserves 50/50 Peak Load + Reserves 4,000 Summer Megawatts 3,000 2,000 1,000 - 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Southwest Connecticut Capacity Situation Emergency Actions SWCT Phase II SWCT Phase I Current Import Limit Net Generating Capacity NOTE: Transmission project in-service dates are subject to delay

  11. Age of Generators in Southwest Connecticut 1,500 60% 1,250 50% 1,000 40% Percent of Total Capacity Capacity (MW) 750 30% 500 20% 250 10% 0 0% >40 31-40 21-30 11-20 0-10 Age of Generators - Years Megawatt Percent

  12. New Haven Bridgeport Stamford Milford Norwalk Post-Contingency ViolationsCurrent System Thermal Overloads

  13. Wholesale Electricity Price Driver • Fuel-adjusted wholesale electricity prices in 2003 were the lowest of the last four years • Clearing prices in the wholesale electricity market rise and fall with changes in fuel costs, particularly for natural gas • Electricity prices will continue to reflect fuel costs

  14. Conclusions and Required Actions • Capacity in Connecticut is inadequate to serve demand reliably • Special measures keep the lights on now in Southwest Connecticut • Timely approval and operation of transmission infrastructure is needed • Market enhancements are needed to encourage investment where it is needed: • New generation resources • Re-powering of older units • Increased demand response and conservation