1 / 40

Carrying Capacity (CC) and LAC

Carrying Capacity (CC) and LAC. Recreation Opportunity Spectrum (ROS). Increased use Increased development. Roaded Natural. Primitive. Semi- Primitive Non-motor. Semi- Primitive Motorized. Rural. Urban. Why is monitoring important?. Identify existing and desired position on ROS

jenny
Télécharger la présentation

Carrying Capacity (CC) and LAC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Carrying Capacity (CC) and LAC

  2. Recreation Opportunity Spectrum (ROS) Increased use Increased development Roaded Natural Primitive Semi-Primitive Non-motor Semi- Primitive Motorized Rural Urban

  3. Why is monitoring important? • Identify existing and desired position on ROS • Promote accountability by park and resource managers • Foster user support for agencies • Identify increased demand • Provide feedback for better planning and management • Identify all impacts, not just economic

  4. What is carrying capacity? Definition: • The maximum level of use that an area or resource can sustain before deterioration occurs.

  5. Types of Carrying Capacity • Ecological or biological • Social and psychological • Physical (facility) • Managerial

  6. What do we measure? • Minimum numbers (at which a park is viable) • Maximum numbers

  7. What do we manage for? • Optimum range

  8. What do we manage for? Minimum (managerial CC) Maximum (mng. CC)

  9. What do we manage for? Maximum (social CC)

  10. What do we manage for? Maximum (env. CC)

  11. What do we manage for? • Optimum range Minimum (managerial CC) Maximum (env. & social CC)

  12. Problem with CC... • Often the impacts have already occurred by the time the CC is determined • No ecosystem is static, but CC is! • Difficult to implement in multiple use areas • 10 hikers • 8 hikers and 2 mountain bikers • 5 hikers and 5 mountain bikers • 3 hikers and 7 mountain bikers

  13. LAC or Limits of Acceptable Change

  14. What is LAC? • A process which requires managers to: • define desired resource conditions and • take actions to maintain or achieve those conditions It does not prevent changes but instead minimizes them!

  15. Some details about LAC... • Monitoring-based resource assessment method • Considers preservation or conservation versus use • Based on ROS classes • Sets standards of use and management • Public involvement process

  16. LAC is NOT Carrying Capacity • Issue is not numbers for LAC, but IMPACTS • For example: • 10 hikers • 8 hikers and 2 mountain bikers • 5 hikers and 5 mountain bikers • 3 hikers and 7 mountain bikers

  17. Four Major Components of LAC • Specify acceptable and achievable resource and social conditions. • Analyze the relationship between existing conditions and acceptable conditions.

  18. Four Major Components of LAC • Identify management actions necessary to achieve the desired conditions. • Monitor and evaluate the effectiveness of management actions.

  19. Step 1 - Identify area issues and concerns • Identify public issues and managerial concerns that relate to: • Distinctive features and characteristics of the area. • Use of the area by people. • The relationship of the area to other similar units and to other local areas

  20. Step 2--Define & describe opportunity classes • Identify ROS Opportunity Classes that generally describe the area • Each park area can have multiple classes Roaded Natural Primitive Semi-Primitive Non-motor Semi- Primitive Motorized Rural Urban

  21. Step 2--Define & describe opportunity classes • Describe the kinds of resource, social, and managementconditions acceptable for the class • Example: Primitive ROS class: • Resource: Minimal impacts on resource • Social: Solitude • Management: Minimal facility development • Management: No motorized vehicle use

  22. Step 3—Select indicators of resource & social conditions • Indicators: Specific variables that indicate the condition of the opportunity class • Example: solitude - number of people encountered

  23. Step 3—Select indicators of resource & social conditions • Indicators must be: • accurate • capable of being measured in a cost effective way • related to the use occurring • responsive to management control.

  24. Why are indicators important? • Allow managers to: • Unambiguously define desired conditions • Assess the effectiveness of various management practices

  25. Indicators for primitive ROS class • Minimal impacts on resource: • Loss of vegetation along trails • Solitude: • Few encounters with other people

  26. Step 4 — Inventory existing conditions • Use indicators from Step 3 to inventory existing conditions. • This is a critical step in determining what and where management is needed.

  27. Inventory Park entrance Rural Roaded natural Primitive

  28. Step 5—Specify standards for indicators • Assign standards (i.e., quantitative measures) to indicators (from Step 3) • Standards provide a BASELINE against which conditions can be judged • Judgmental process, but logical, traceable, and subject to public review

  29. Standards for primitive ROS class • Minimal impacts on resource: • Indicator: Loss of vegetation along trails • Standard: Trail width no more than 2 feet • Solitude: • Indicator: Few encounters with others • Standard: 0 - 1 encounters/day

  30. Step 6—Identify alternative opportunity class allocations • Decide what our ROS alternatives are • A diversity of opportunity classes may be represented in one park. • Balance desired conditions with reality • Need input from both managers & users

  31. What we have... Park entrance Rural Roaded natural Primitive

  32. Alternative 1: What we want... Park entrance Rural Roaded natural Primitive

  33. Alternative 2: What we want... Park entrance Rural Primitive

  34. Alternative 3: What we want... Park entrance Rural Roaded natural Primitive

  35. Step 7—Identify management actions for each alternative • For each alternative, identify differences between current conditions (step 4) and the standards (step 5) • When conditions exceed standards, there is no need for management • When conditions are close to or worse than standards, management is necessary • Design management strategies for each alternative.

  36. Compare standards... • Minimal impacts on resource: • Indicator: Loss of vegetation along trails • Standard: Trail width no more than 2 feet • What we have: Trail width of 1 foot • Management strategy? • Solitude: • Indicator: Few encounters with others • Standard: 0 - 1 encounters/day • What we have: 5 encounters/day • Management strategy?

  37. Step 8—Evaluate and select a preferred alternative • Selections is made by managers and local residents…no formula • Considerations: • What user groups are affected and how? • What values are promoted or diminished? • Does the alternative contribute to park/wilderness system diversity? • What is feasible (personnel, budget…)?

  38. Step 9—Implement actions & monitor conditions • Systematic feedback on how well management actions are working • Identify trends in conditions that require new actions • Show what type of management actions solve what type of problems

  39. Identify an indicator and standard for... • Roaded Natural campground which is having difficulty with conflicts between campers.

  40. Identify an indicator and standard for... • Primitive area which is managed for an endangered animal species.

More Related