An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Schedule for UB production & quality requirements L.P.C.C. COLLEGE DE FRANCE Stephane COLONGES September 2001

  2. Schedule for UB production & quality requirements - LPCC CDF - Sept. 2001 • Schedule for UB pre-production & production. • Quality requirements for Unified Board pre-production & production.

  3. Schedule for production - LPCC CDF - September 2001 • Since August 24th, 2001 : public tender is published (European restricted procedure). • November 2001 : after the 1st candidates selection, the specification document will be sent. AT THIS TIME THE DESIGN HAS TO BE FINISHED!!!

  4. Schedule for production - LPCC CDF - September 2001 • January 2002 : selection of the better offer, taking in consideration the production schedule, costs and quality insurance. • Before March 2002, we want test our first prototype « UB » with PMT Bases, a complete FE, Led flasher, and all other parts. • We can not start the industrial production without this tests!

  5. Schedule for production - LPCC CDF - September 2001 1st Industrials prototypes : *03/02 : 2 prototypes *04/02 : 8 prototypes Pre-production of 120 UB units Public tender published 1st UB Tests with all parts 20 UB units sent to labs & 100 UB units in Argentina for integration / installation in the Pampa 1st UB prototype conception We must define all UB`s specifications, as well for all other parts Industrials prototypes tests in laboratory & Malargue L.A.L. Test Bench Specifications document sent to candidates Offer selection 09/01 10/01 11/01 12/01 01/02 02/02 03/02 04/02 05/02 06/02 07/02 08/02 09/02 10/02

  6. Schedule for production - LPCC CDF - September 2001 Production of 900 UB Production of 800 UB Installation of 600 UB in Pampa Pre-production evaluation (final tests) Integration / Installation of 900 UB in Pampa Production evaluation 11/02 12/02 01/03 02/03 03/03 04/03 05/03 06/03 07/03 08/03 09/03 10/03 11/03 12/03 01/04 02/04 03/04 05/04 06/04

  7. Schedule for production - LPCC CDF - September 2001 This schedule depend on : • Component availability • Budget possibility • Prototypes testing approbation • Factory disponibility • We must define all UB specifications

  8. Quality requirements for Unified Board - LPCC CDF - Sept. 2001 • Quality insurance : In our public tender we have asked for the ISO 9000 quality insurance (or equivalent), technical and man power resources, tests procedures, production logging system and boards backtracking. • The boards reliability is defined by the MIL-HDBK-217F standard (ground fixed conditions) • The MTBF index is determined and must be equal to the Auger life time.

  9. 09/01 10/01 11/01 12/01 01/02 02/02 03/02 04/02 05/02 06/02 07/02 08/02 09/02 10/02