1 / 4

TS-CE Group Organization Chart (1st January 2007)

TS-CE Group Organization Chart (1st January 2007). J.L. Baldy. Budget Follow-up & General Services L. A. Lopez (20%) C. Bieri (20%). L. A. Lopez (20%). Secretary (ABS) F. Girard-Madoux. LHC PROJECT J. Osborne* (40%). OTHER PROJECTS (J-L. Baldy).

jett
Télécharger la présentation

TS-CE Group Organization Chart (1st January 2007)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TS-CE Group Organization Chart (1st January 2007) J.L. Baldy Budget Follow-up & General Services L. A. Lopez (20%) C. Bieri (20%) L. A. Lopez (20%) Secretary (ABS) F. Girard-Madoux LHC PROJECT J. Osborne* (40%) OTHER PROJECTS (J-L. Baldy) MAINTENANCE AND WORKS INQUIRIES R. Morton DESIGN OFFICE M. Poehler (50%) D. Parchet L.A. Lopez (50%) S. Anghelone (80%) C. Biot M. Lager E. Perez-Duenas N. Baddams A. Kosmicki X : prévu 01.07.07 J. Osborne (20%) C. Girard (FM) (30%) M. Poehler (50%) • External CE Design Contract • FREY – B1237/TS • IDOM – B1236/TS • External CE Works contractors • LOSINGER – C188 • INIZIATIVE INDUST. – C189 • COSTA – C190 • PREZIOSO – C191 *40% Experimental Area Manager Pt 5 for TS-LEA Total CERN staff CE : 11.5 (+ 1.2 ABS)

  2. Main CNGS Shielded & fireproof doors Budget : 150 KCHF CLEX – Klystrons Gallery Site work begins: mai 2006. Work duration : 12 months. TS Budget : 3.1 MCHF Point 5 2006 = 750 Kchf CERN Control Centre CCC Inauguration March 16, 2006 TS Budget : 5.1 MCHF. Work duration : 14 months 513 - GRID Foundation reinforcements for Grid & HVAC installation. Budget : 800 KCHF Concreting of Blockhouse Structures 2500 ton test loading of PX56 Plug May 2006 Student Hostel 3 – Bld. 41 Site work begins : March 2006. Work duration : 13 months. TS Budget : 7.5 MCHF. 87 single rooms, 10 double rooms Waterproofing of the off-site retention basin Projects

  3. Design UX45 New PS2 Other designs Globe PMI2 ILC – CFS - RDR : 510 124 Linac 4 Alice blocks 676 Works • DO section projects in figures : • Internal drawing design project treated : 80 • Static structural control request : 32 • External design management contract commitments : 125 KCHF

  4. Maintenance Workshop area Concrete stud columns TX1ST - Losinger Alice Control Room CCC Parking SVC3 Slab foundation Prévessin - Losinger And work Inquiries • OSVC (x200) • CE-MW : 1’358’859 • LHC-CE : 113’244 • Hostel 3 : 8’224 • CCC : 3’842 DAI (x184) • CE-MW : 1’765’995 • Code 96xxx : 373’046 • Globe : 148’765 • CCC : 8’689 TOTAL : 3’780’664

More Related