An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Improving Your Construction Site Ryan Alltop, CPESC, DECI Construction Division Manager

  2. Overview • Know the Regulators • Know the Regulations • Follow the Regulations and your SWPPP • Manage Your Subcontractors • During Construction Modification • Stabilize • Signoff

  3. Know The Regulators • National Pollutant Discharge Elimination System (NPDES) -Construction Activities USEPA • 327 IAC 15-5 Administered by the Indiana Department of Environmental Management • Local Regulations by MS4s and SWCDs

  4. Know The Regulations • SWPPP Submitted to IDEM and MS4 • Public Notice Given • Notice of Intent (NOI) – Must show proof of SWPPP and Public notice. Image from Fanpop.com

  5. Know The Regulations • 70 percent cover for areas not being worked on for 15 days. • Inspections every week or within the first business day after a measurable storm event (.5 inches) • Notice of Termination (NOT) • NOT may only be submitted after a Perennial Stand of Vegetation having 70 percent or greater coverage has been established.

  6. Follow The Regulations and Your SWPPP • Inspect your site at the correct time. • During rainstorms or immediately after. • Driest day in July won’t tell you much. • Improve your BMPs, and Modify or Switch BMPs that don’t work • Update your SWPPP • Avoid offsite discharge of sediment

  7. Manage Your Contractors • If something will effect your bottom line make it effect theirs • Teach them about your SWPPP and how it effects them • Let them know your expectations while they are on your site

  8. During Construction Modification • If it is Broken Fix it!

  9. Stabilize

  10. Sign Off • Submit Your Notice of Termination • Must Have 70 Percent Permanent Perennial Vegetative Cover • Remove temporary sediment control BMPs

  11. Questions? Ryan Alltop Construction Division Manager ENCAP, Inc. 2585 Wagner Ct., DeKalb, IL 60115 815-748-4500 ENCAP, Inc. 772 North Madison St. Crown Point, IN 46307