1 / 8

Acquisition Process Integrated Process Team

Acquisition Process Integrated Process Team. Work with all stakeholders early in the PBL formulation process to develop system support strategy Develop SOW and determine contractual metrics Ensure that Core issues are being addressed: Is the system Core?

johnna
Télécharger la présentation

Acquisition Process Integrated Process Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Acquisition ProcessIntegrated Process Team • Work with all stakeholders early in the PBL formulation process to develop system support strategy • Develop SOW and determine contractual metrics • Ensure that Core issues are being addressed: • Is the system Core? • Is there Navy/DoD core logistics capability? • What is depot impact? • What is Core strategy? • Address Core compliance strategy in the J&A • Construct the Business Case Analysis • Initiate Congressional Notification as early as possible

  2. Business Case Analysis • Material Costs • Procure Repair • Other Costs • Inventory Control • Management OH • Warehousing • PHS&T • Asset Visibility • Engineering • Other • Proposal • Material: Procure Repair • Inventory Control • Management OH • Warehousing • PHS&T • Asset Visibility • Engineering • Other Business Case Analysis PBL Proposal Should Target Performance Improvements and Not Cost More Than Tradition Support

  3. Statutory RequirementsThe 50/50 Rule 10USC § 2466 • Not more than 50 percent of the funds made available in a • fiscal year to a military department or a Defense Agency • for depot-level maintenance and repair workload may be • used to contract for the performance by non-Federal • Government personnel of such workload for the military • department or the Defense Agency. Any such funds that • are not used for such a contract shall be used for the • performance of depot-level maintenance and repair • workload by employees of the Department of Defense Applied at the Service (DON) level

  4. Statutory RequirementsCLC Rule 10USC § 2464 • Core Logistics Capabilities shall include those capabilities that are • necessary to maintain and repair the weapon systems and other • military equipment (including mission-essential weapon systems or • material not later than four years after achieving initial operational • capability, but excluding systems and equipment under special • access programs, nuclear aircraft carriers, and commercial items) • that are identified by the Secretary, in consultation with the • Chairman of the Joint Chiefs of Staff, as necessary to enable the • armed forces to fulfill the strategic and contingency plans prepared • by the Chairman of the Joint Chiefs of Staff. If system is Core, DoD must have Core logistics capability

  5. Statutory RequirementsCore Determination • NAVSEA core determination is made at the platform (ship) level • NAVAIR normally takes core determination down to the individual repairable component (DLR) level… however precedence has been set for a platform-level CORE determination on some PBLs • NAVSEA and NAVAIR interpret Core logistics capability differently

  6. Statutory Requirements Other Restrictions • Congress must be notified when: • Under 10 USC 2461 for any work being changed from performance by DoD civilian employees to the private sector • Under 10 USC 2464 the first time an item is determined commercial for the purposes of applying the section 2464 commercial item exception • Under 10 USC 2469 can not move more than $3M workload/year from a DoD depot unless merit-based selection procedures/competitive procedures are used • `

  7. Awarded PBLs $M Obligations The Wave of the Future

  8. Awarded PBLs Auxiliary Power Unit Title 10 Compliant • SupportsC-2, F/A-18, S-3andP-3. • Public / Private Partnership • Honeywell... Program Management • NADEP Cherry Point... Sub-contractor performing touch labor • 10-Yr Performance Based, Firm Fixed Price (5 year base & 5 one-year options) • 25% - 45% Reliability Improvement • Delivery Guarantees... 2 Days (IPG 1) • Obsolescence Management • Surge Capability...120% of Annual FH’s • Product Support Engineering Plus: On-Line Shipping & Inv Mgmt

More Related