The Westcor Power Corridor Project

n e l. The Westcor Power Corridor Project. Dem. Rep. Of CONGO. KINSHAZA. 400 kV HVAC System to supply Kinshaza. ENE HYDRO’S KUANZA 6000 MW. ANGOLA. NAMIBIA. BOTSWANA. GABORONE. Auas. PEGASUS. South Africa. OMEGA. INTRODUCTION.

jolanta
Télécharger la présentation

The Westcor Power Corridor Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. n e l The Westcor Power CorridorProject

  2. Dem. Rep. Of CONGO KINSHAZA • 400 kV HVAC System • to supply Kinshaza ENE HYDRO’S KUANZA 6000 MW ANGOLA NAMIBIA BOTSWANA GABORONE Auas PEGASUS South Africa OMEGA INTRODUCTION • The WESTCOR project is intended to exploit the environmentally friendly, renewable, hydroelectric energy at: • Inga III (DRC) 3500MW • Cuanza Basin (Angola) 6000MW • Envisioned mode of transmission is via two 400kV HVAC lines from INGA III to Capanda Power Station (Angola). • Another 400 kV, 400 MW capacity HVAC from INGA III to Kinshasa (DRC). • Two multi-terminal HVDC systems will be established through Angola, Namibia, Botswana and South Africa.

  3. WESTERN POWER CORRIDOR (Snel – ENE – NamP – BPC - Eskom) • HVDC • 3.000 km • 3.500 MW • 3.000 MW • - Kuanza • (Angola) • Auas • (Namibia) • Goborone • (Botswana) • Omega • Pegasus • (South Africa) • 5.000 Mil Euro • prefeasibility • (2005) Voltage type Length Capacity (MW) Power Demand Converter Stations Investment Cost Study completed Dem. Rep. Of CONGO KINSHAZA INGA • 400 kV HVAC System • to supply Kinshaza ENE HYDRO’S KUANZA 6000 MW ANGOLA NAMIBIA BOTSWANA GABORONE Auas PEGASUS South Africa OMEGA

  4. Progress • An Inter-Governmental MOU on co-operation for the development of the Western Power Corridor project (Westcor). The MOU was signed on 22 October 2004 in Johannesburg, South Africa. • Following the signing of the Inter-Governmental MOU, the Chief Executives from the five national power utilities also signed an Inter-Utility MOU. • The Member Utilities to reaffirm their commitment of USD 100 000 as start-up capital to fund the operations of the project office and their contribution to be deposited in the Escrow Account in Botswana. • The launch of the 20 months pre-feasibility studies at the cost of USD 2.5 mil • Urged Member Utilities to support the launch of a 44 months feasibility studies at a cost of USD 4 mil