1 / 6

AN INTRODUCTION TO:

TECHNICAL. GUIDELINES. from the leading resource for education and information in the repair industry. ICRI Technical Guideline No. 130.1R-2009. AN INTRODUCTION TO:. Procurement Methods. Guide for Methods of Measurement and Contract Types for Concrete Repair Work. Formerly 03735.

jonathang
Télécharger la présentation

AN INTRODUCTION TO:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TECHNICAL GUIDELINES from the leading resource for education and information in the repair industry... ICRI Technical Guideline No. 130.1R-2009 AN INTRODUCTION TO: Procurement Methods Guide for Methods of Measurement and Contract Types for Concrete Repair Work Formerly 03735

  2. This guide is intended to assist owners, consultants, and contractors in defining recommended methods of quantity measurement and contract types for concrete work. ICRI Guideline 130.1R-2009 Procurement Methods Guide for Methods of Measurement and Contract Types for Concrete Repair Work Purpose of This Guideline

  3. Owners and consultants who are preparing bid documents and need to define quantities and the amount of work required to complete the project in a satisfactory manner. • Contractors who are preparing bids on projects where the extent of deterioration may be unknown and where actual repair quantities often differ from initial quantity estimates, possibly resulting in changes to the scope of the work. • Owners, consultants and contractors who require methods of measurement and contract measurement which need to allow for variations from the original estimated quantities determined from the initial survey and project scoping. ICRI Guideline 130.1R-2009 Procurement Methods Guide for Methods of Measurement and Contract Types for Concrete Repair Work Who is this guideline for?

  4. Standardization of repair work items and methods of measurement to enable fair compensation to be made based on actual conditions. • Measurement methods that provide a means for quantification for repair work in progress and completed. • Establishes a uniform method of payment for work performed, and accounts for variations in the quantities. Guide for Methods of Measurement and Contract Types for Concrete Repair Work What is covered?

  5. Regardless of contract type, quantification and documentation of repair work must occur for identification for compliance to the contract and acceptance for payment. • Provides designers, specifiers and owners with acceptance criteria of in-place repairs. • Provides a standardized method of measurement for typical repair items for concrete repair. Guide for Methods of Measurement and Contract Types for Concrete Repair Work Benefits of Using This Guide…

  6. TECHNICAL GUIDELINES from the leading resource for education and information in the repair industry... ICRI Technical Guideline No. 130.1R-2009 Find it at WWW.ICRI.ORG Procurement Methods Guide for Methods of Measurement and Contract Types for Concrete Repair Work Available in Hard Copy or as a PDF download

More Related