110 likes | 231 Vues
This report outlines the findings and proposed activities for the 2008 Annual Study Program presented by David Franklin during the Technical Studies Subcommittee meeting in Seattle, WA (August 15-17, 2007). Key topics include disturbance regions, performance logs, and updates to the study program. The report presents a detailed disturbance list, critical outage identification, proposed base cases, and reviews of the Performance and Representation Logs. The document also discusses preparations for upcoming SRWG workshops and meetings.
E N D
WESTERN ELECTRICITY COORDINATING COUNCILTECHNICAL STUDIES SUBCOMMITTEEAugust 15-17, 2007Seattle, Washington SRWG REPORT Presented by: David Franklin
Presentation Topics • 2008 Study Program • Disturbance list • Disturbances per Regions • Changes to 2008 Annual Study Program Outline **Approval Item** • Performance Log Review • Tri-State Status of Performance Log • Representation Log Review • Revised Rep Log • Recording PSS Data • Circulating Loop Flow in Base Cases • Stressed Base Cases to Achieve Maximum Path Flows • SRWG Handbook • Data Preparation Procedural Manual • Guideline, Procedure, or Policy • SRWG Workshop – Oct. 31st San Francisco, CA • SRWG Proposed 2008 Meeting Locations2007 Study Program
Annual Study Program • Disturbance list for 2008 Annual Study Program • PATHS • 16 (Idaho Sierra), 24 (PG&E Sierra), 27 (Intermountain DC), 28 (Intermountain-Mona 345), 29 (Intermountain-Gonder 230), 30 (TOT 1A), 31 (TOT 2A), 32 (Pavant/Intermountain-Gonder), 33 (Bonanza West), 34 (TOT 2B 1&2) 35 (TOT 2C) (NE of Vegas), 36 (TOT 3), 39 (TOT 5) 40 (TOT 7), 76 (Alturas Project) • Of the 15 paths identified there are only 2 known SPS/RAS outages • DGT-1 (Bonanza Unit Dropping), PACE-1 (Mona-IPP Power & Voltage Relay Scheme), • Critical outage for each path will be identified • Additional outages include: • Midpoint-Summer Lake Palo Verde-Devers 1 & 2 Harry Allen – Mead 500kV • Disturbances per Regions • Idaho/Montana – 2007 • Colorado/Utah/Northern Nevada 2008 • Canada/NW/COI - 2009 • California between Path 15 and W of River - 2010 • Desert SW/Las Vegas/Arizona/New Mexico - 2011
2008 Annual Study Program Outline • PROPOSED BASE CASES FOR 2008 • 5 Operating Cases, Two 5-year Base Cases, Two 10-year Base Cases, & Two Scenario Base Cases • 2008-09 HW2-OP • 2008 LW2-OP • 2009 HSP1-OP • 2013 HS1 (5 year) • 2015-16 HW/Sys Val/TEPPC • 2012-13 LW1-S (5 year) • 2011 HA1-S 2013-2014HW1 • 2009 HS3-OP • 2009 LS1-OP • 2013-2014HW1 2019 HS1 • 2018-19 HW1 (10 year)
Performance Log Review • TRI-STATE PERFORMANCE LOG REVIEW • Tri-State Plans to present revised study results at the November 2007 SRWG Meeting for review/approval.
Representation Log Review • The Rep Log was reformatted for clarity • 428 Rep log items including missing PSS for generators • This Rep Log is a comparison between the 08LW1 pre-run and approved base cases. • PSS Survey was sent out in January 2007 • For Generators 75MVA or greater • 75% Response • PSS Survey was be sent out for those generators 30MVA – 75MVA in May 2007
Circulating Loop Flow In Base Cases • Circulating loop flow in bases have been identified. The target flows were not met. • Few base cases were posted that did not meet the following criterion: • Actual flows within 10% of target are acceptable, but not to exceed the actual rating of the path. • SRWG Evaluating the need of a Task Force to address this issue • Stressed Base Cases – Scenario Base Cases
SRWG Handbook • The SRWG completed the final SRWG Draft Handbook. • The SRWG Handbook is presented to TSS for review/comments.
Data Preparation Procedure Manual • The DPPM completed the final SRWG Draft Handbook. • The DPPM was revised to address the NERC Standards. • The SRWG Handbook is presented to TSS for review/comments.
SRWG Workshop • SRWG Workshop – Oct. 31st San Francisco, CA
2008 SRWG Meeting Locations • 2008 SRWG Proposed Meeting locations • March Victoria, BC • July Portland, OR • November San Diego, CA