This document outlines the latest advancements in hybrid industrial testing with a focus on version 1.3 of the FHITS system. Key improvements include enhanced current consumption measurements, improved user interface, and XML file conversion for seamless integration with CERN requirements. The report addresses the difference in triggering capabilities between FHIT, ARC, and CMS-like systems, and offers new testing mechanisms aimed at ensuring better reliability and efficiency. The collaboration involves multiple institutions including UCL, RWTH Aachen, and IRES Strasbourg, showcasing a commitment to advancing hybrid technology.
E N D
Front end Hybrid Industrial Tester UCL Louvain(L. Bonnet, V. Lemaître, X. Rouby) vincent.lemaitre@fynu.ucl.ac.be In collaboration with RWTH Aachen(M. Axer, F. Beissel, T. Franke, J. Mnich) IRES Strasbourg(JD. Berst, P. Graehling, P.Juillot, C. Maazouzi) http://www.fynu.ucl.ac.be/themes/he/cms/activities/tracker/hybrids.html Vincent Lemaitre tracker week 29.01.03
Current measurements • Comparisons between FHIT & ARC & CMS-like : FHIT does not send triggers while measuring current consumption whereas ARC and CMS-like system do ARC FHIT • This problem is solved : FEH needs more current when triggered
Electrical Test: limits From statistics on FHIT measurements intervals = [m-3s; m+3s] where m is the mean of distribution and s the RMS • These limits can be resized with a multiplicative parameter, common for all limit values (available in configuration file).
Functional Test: limits These are the ARCS parameter All these limits are accessible in the configuration file
FHITS 1.3 New : version 1.3 (updated interface, as asked by industry) • Display the # of good and bad hybrids of the current day • All part-numbers accepted 1663 1674 (new firmware)
Conversion to XML • conversion to XML: direct contact with CERN people to fit to their wishes • C – routine being written in Louvain ; not necessary @ industry • proposed scenario • production and tests @ industry ( logfile creation ) • delivery @ CERN of hybrids and logfiles (on CD-R) • 1 delivery = # FEH + 1 CD (+ copies) • tests @ CERN (with FHIT logfile creation) • creation of XML files(by running the C – routine) @ CERN • transfer to database
Test procedure S A M T E C S A M T E C N A I S N A I S E R N I E R N I FHIT To be tested Test setup • Industry 1: Naked hybrids (w/o APVs) • Industry 2: Hybrids • Before bonding pitch adapter LINK to DB (XML) @ Industry @ CERN
Mechanics New mechanics : -Easier to handle -Insure thermal contact (“cooling”) -Probe for test of bias return line Heavy cover with auto-retractile probe Pad on hybrid for test of bias return line Hybrid Fine positioning plugs Cooling contact
Summary • Difference between set-ups for Current Measurement is understood • First estimate of Limits for ET and FT have been evaluate (to be continued) • Most recent release of software distributed (FHITS 1.3) -improved display -all part number included (firmware) • Agreed procedure for loading FHIT data into DB (almost operational) • Proposal for the number of FHIT set up • Test procedure including thermal contact of hybrid and test of bias return line.