Evaluating the Benefits of the SPP EHV Buildout

Evaluating the Benefits of the SPP EHV Buildout. Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009. Benefits Beyond Adjusted Production Cost. Already Discussed Line loss benefits Additional reliability benefits

judd
Télécharger la présentation

Evaluating the Benefits of the SPP EHV Buildout

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluating the Benefits of the SPP EHV Buildout Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009

  2. Benefits Beyond Adjusted Production Cost • Already Discussed • Line loss benefits • Additional reliability benefits • Reductions in capacity margin and reserves • Increased options for different futures • What we haven’t discussed is a way to use the wind resources we are attempting to reach to help solve cost problems

  3. What are the cost problems? • Many benefits go to tier one entities that do not have to fund the investment • SPP and others have attempted to minimize this by not evaluating benefits and costs of “export legs” of the EHV buildout • “rebalancing these costs leads to large rate impacts for some entities soley based upon location in a zone and past construction decisions. • Is there a way to justify access to the wind resources and fund investment for this access?

  4. NREL Wind Maps • SPP Maps for all states except Louisiana • Western regions of SPP have superior wind resources (class 4 or better) • Eastern regions of SPP have lesser wind resources (class 3 at best)

  5. What does this show? • Wind Resources are significantly located in the Western regions of SPP • Very limited wind resources in Missouri, Arkansas, and eastern SPP portions of Texas, Kansas, Oklahoma • Eastern Nebraska and Kansas have some class 4 wind resources

  6. What difference does wind class make?

  7. Capacity Factor vs Wind Class

  8. Production of Same Wind Equipment at Different Wind Classes

  9. Basic Equations • Cc = installed capital costs of wind generation in $/kw • Cr = Charge Rate (carrying charge - %) • Pretax ROR + Depreciation • Om = O&M costs in $/MWH • Tc = Production Tax Credit in $/MWH • H = Om – Tc • CF = Capacity Factor - % • AC = Annual Costs in $/KW of installed capacity

  10. Basic Equations (cont) • AC = Cc Cr + HCF ( 8760 ) 1000 Then • AC = Cc Cr + 8.76 HCF

  11. What Is Location Worth? • Assume 2 wind units, same installed costs, variable O&M, PTC, and carrying costs • The only difference is average wind speed or capacity factor Then, • AC1 = Cc Cr + 8.76 HCF1 • AC2 = Cc Cr + 8.76 HCF2 • Therefore • AC1 - AC2 = 8.76 H(CF1 - CF2)

  12. Example Used in Analysis of Wind Generation Costs • Cc Cr - Overall annual fixed costs of $326.40 per KW installed nameplate capacity • 12% pretax ROR • 5% depreciation (twenty years) • Results in 17% carrying charge • $1920/KW of installed nameplate capacity • May 2008 DOE EERE publication • Om - $9/MWH average O&M costs • Tc - $20/MWH PTC then H = -$11/MWH, therefore, • AC1 - AC2 = 8.76 H(CF1 - CF2), goes to • AC1 - AC2 = -96.36(CF1 - CF2)

  13. Annual Cost per MWH of New Wind Generation Based on Wind Class Average

  14. How much is the increase worth?

  15. How much transmission investment is justified to access better wind resources?

  16. How much transmission investment is justified to access better wind resources?

  17. How much transmission investment is justified to access better wind resources? (cont)

  18. Base Case AssumptionMoving from East to West Increases Capacity Factor by Around 50%

  19. Things to consider for EHV system • Is there a method of using an access fee for better wind resources to justify portions of the EHV buildout? • This may allow consideration of the export legs of EHV plan • Export legs of EHV plan may bring additional benefits to Eastern SPP transmission zones • But typically many benefits to tier 1 • These benefits could be captured with some type of access charge for funding the EHV buildout • Nebraska should be included in EHV proposals

  20. Wind Access Fee • Is there a way to charge a wind access fee that would be equitable for both regional customers and customers outside SPP? • For example could the wind access fee be a credit to zones already paying an SPP regional EHV rate? • Could the export revenue be used to lower costs and justify expansion? • Could “reservations” be used to justify EHV expansion (such as an export capacity auction?)