RECEIVING PROBLEM & COUNTERMEASURE RESPONSE

RECEIVING PROBLEM & COUNTERMEASURE RESPONSE. Occurrence Analysis. Responsible Department. Responsible Department. (1). (2). (3). (4). (5). 5-Why. (Occurrence). Responsible Department. Responsible Department. (1). (2). (3). (4). (5). 5-Why. (Non-Detection). Page 1/2.

Télécharger la présentation

RECEIVING PROBLEM & COUNTERMEASURE RESPONSE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RECEIVING PROBLEM & COUNTERMEASURE RESPONSE Occurrence Analysis Responsible Department Responsible Department (1) (2) (3) (4) (5) 5-Why (Occurrence) Responsible Department Responsible Department (1) (2) (3) (4) (5) 5-Why (Non-Detection) Page 1/2 RPCR Due Date: RPCR #: Rank: Date: Supplier: Supplier Code: Problem Summary: 8/31/01 RPCR.PPT

  2. Page 2/2 CAUSE & EFFECT INVESTIGATION LOG Date: ______________ EFFECT: Actual Cause Type of Investigation Person Responsible for Action Results of Investigation YES NO ? X Branch Potential Causes Machine Material Methods Man Milieu Status Summary: Responsible Due (Place countermeasure number(s) in corresponding result of 5-why) Countermeasures Responsible Department Responsible Department Across-Line Action Responsible Section Approvals: Production Control Engineering Approvals: Distributed Approved Checked Approved Checked Written Resp. Dept. Prod Ctrl Engr (Inclds approval for NDSALES Fax) Return to Production Control Engineering when completed and approved. 8/31/01 RPCR.PPT