1 / 14

Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

CATHI Marie Curie Initial Training Network C ryogenics, A ccelerators and T argets at H IE- I SOLDE. Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012. Outline. Background Activities at CERN LINAC Other Training Contacts Publications

judith
Télécharger la présentation

Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CATHIMarie Curie Initial Training NetworkCryogenics, Accelerators and Targets at HIE-ISOLDE Guillaume KAUTZMANN (BE/ABP/SU)* WP4, ESR6 Mid Term Review Meeting, 26 September 2012

  2. Outline • Background • Activities at CERN LINAC Other • Training • Contacts • Publications • Future Work and Trainings

  3. Background Previous Education: • 2009: Masters of Science in Topography • National Institute of Applied Science, Strasbourg, France Work Experience: • 2010-sep. 2011: Instrumentation Engineer on the construction of the french nuclear research facility “Laser MegaJoule” • Soldata, Bordeaux, France • Jan. 2009-Sep. 2009: Master Thesis and working in GPS and Airborne Surveying Methods • Fugro Geoid, Montpellier, France

  4. Activities at CERN LINAC – Alignment Specifications • Alignment and monitoring of the Cavities and Solenoids in the Cryomodules • Alignment w.r.to a common nominal beam line (NBL) along the Linac • Permanent system • Precision demanded along radial and height axis at 1 sigma level : • 300 microns for the Cavities • 150 microns for the Solenoids NBL ~16 m +/-150 micr +/-300 micr

  5. Activities at CERN LINAC – Alignment Concept Proposed concept: • Hardware: • BCAM based observation • Metrological tables • Targets • Viewport crossing • Conditions: • Cryogenic • High Vacuum 3D Reconstruction Software

  6. Activities at CERN LINAC – Specific (1/2) BCAM Studies: • Field of view issue • Development of a new BCAM called HBCAM •  Technical specification + Technical Visit to Brandeis (USA) Viewports studies: • Tests to check the viewport qualities • Tests to check and validate theoretical models in order to correct the effects on the optical measurements • Deformation  Liberec University (Czech Republic) + CERN TE/MSC-CMI Target studies: • Studies of different target types  Two types are going to detailed conception • Cryotest withMario Herrmann (TE/VSC)

  7. Activities at CERN LINAC – Specific (2/2) Software: • Participation on the reconstruction software done by S.Waniorek (BE/ABP/SU) • Test bench: • Needed to : • - Validate the theoretical foundation of the software • - Test of the different hardware parts • First results promising on the comparison reference measurement/ Reconstructed position by the software Integration: • Implication in several decisions regarding the integration of the alignmnent system in the tunnel • Integration of the alignment system to the Cryomodule design

  8. Activities at CERN Other Cryomodules Assembly: • Participation on the survey and alignment for: • Assembly chain of the cryomodules • Clean room design Transfer lines: • Participation on Transfer lines Working Group • Special focus on the alignment of elements between magnets • Inter Tank: • Participation on DiagBox Working Group

  9. Training (1/2) First months: • Familiarization phase with the survey methods and CERN administrative procedures Training courses: • “Radiological Protection Course”@ CERN; • “Self-Rescue Mask (Biocell)” @ CERN; • “Post-induction training (HRT, EDH, EDMS, INDICO and CDS)” @ CERN; • “Project Engineering” @ CERN;

  10. Training (2/2) Technical Visit: • ATLAS Experiment visit where a BCAM solution is implemented; • Brandeis University (Waltham, Massachusetts, USA); • Open Source Instrument (Waltham, Massachusetts, USA); • Tevatron (Fermilab, Illinois, USA); • Conference, Seminars, Workshop: • “12th International Workshop on Accelerator” • @ Fermilab, Batavia, U.S.A (September 10-14, 2012);

  11. Contacts • Contacts • with other MC Fellows • with other CERN Departments, principally TE • outside CERN: • Meca-Test (mechanical company, Switzerland) for the target development; • STPS (mechanical company, France) for the test Bench; • EREO (optics) for the development of tools for window adjustment; • OSI for the development of new BCAM;

  12. Publications • Technical specification: “HIE-ISOLDE Specification for the development Of HBCAM” EDMS N°: 1231567; • IWAA 2012: • 1. “The HIE-ISOLDE Alignment and monitoring system Software and test mock up” (primary author + presentation); • 2. “HIE-ISOLDE Alignment and Monitoring System Technical Design and Project Status” (primary author); • Cryomodule design Working Group: • 1. “HIE-ISOLDE Cryomodule Technical Review -The Alignment System - April 26th, 2012”, EDMS N°: 1214768, (Participation on the presentation support); • 2. “News on BCAM tests – December, 15th, 2012”; • Beam department newsletter: Article in the life section - September 2012 • Several presentations for working groups, security, quality…

  13. Future Work and Training • Work: • Extend the test Bench; • HBCAM development; • Participation on metrological table design; • Survey for Cryomodule assembly, clean room, … • Training: • “Cern Accelerator School”@ Granada University (October 29th to November 9th, 2012); • Secondment: • - Brandeis University (Waltham, Massachusetts, USA); • Presentation skills; Programming in C++; Travailler en sallepropre…

  14. Thanks for your attention