1 / 8

Geodetic Network Development

new. old. Geodetic Network Development. * For one (1) municipality at 5 km interval. 1.Project Planning and Coordination. 2.Reconnaissance & Installation of Monuments. 3.GPS Observation. 4.Data Processing and Evaluation. 5.Databanking, Posting and Archiving. 1. Data Gathering.

julie
Télécharger la présentation

Geodetic Network Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. new old Geodetic Network Development * For one (1) municipality at 5 km interval. 1.Project Planning and Coordination 2.Reconnaissance & Installation of Monuments 3.GPS Observation 4.Data Processing and Evaluation 5.Databanking, Posting and Archiving

  2. 1. Data Gathering 3. Recovery of 3rd and 4th Order Reference Points* 2. Data Conversion 4. GPS Observation 5. Data processing and Evaluation 6. Databanking and Archiving 7. Derivation of Local Transformation Parameters

  3. 1. Acquisition and Installation of ICT Equipment 2. Systems Enhancement and Revision* 3. Systems Documentation 4. Systems Installation and Users Training 5. Maintenance and Users Support

  4. 1. Systems Analysis and Design 2. Acquisition of ICT Resources* 3. Systems Development, Testing and Revision 4. Systems Documentation 5. Systems Installation and Users Training 6. Maintenance and Users Support

  5. Data Transformation (1 province/region) * If reference points are not well distributed then establishment of additional points based under the old datum is necessary.

  6. GNIS Development (16 regions) * To be carried out simultaneously with Activity No. 1

  7. Basic GNIS Setup per Region

  8. Application Systems Development (3 systems) * To be carried out simultaneously with Activity No. 1 of GNIS Development

More Related