1 / 6

Southern African Power Pool

Southern African Power Pool. SESSION 3: OVERVIEW. Power Pool Members . Angola Botswana Democratic Republic of Congo (DRC) Lesotho Malawi Mozambique Namibia South Africa Swaziland Tanzania Zambia Zimbabwe . Power Pool Overview (1) . SAPP was set up in August 1995

julinka
Télécharger la présentation

Southern African Power Pool

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Southern African Power Pool SESSION 3:OVERVIEW

  2. Power Pool Members • Angola • Botswana • Democratic Republic of Congo (DRC) • Lesotho • Malawi • Mozambique • Namibia • South Africa • Swaziland • Tanzania • Zambia • Zimbabwe

  3. Power Pool Overview (1) • SAPP was set up in August 1995 • Main objectives: • Provide forum for the development of a world class, robust, safe, efficient, reliable and stable interconnected electrical system in Southern African region. • Optimise the use of available energy resources in the Southern African region and support one another during emergencies. • Key activities undertaken so far: • Established the short-term energy market (STEM) in April 2001. • Completed SAPP telecommunications study in 2001 with implementation of the recommendations following in 2005/6. • Frequency relaxation project completed & implemented in 2003. • Transmission wheeling tariffs implemented in phases from January 2003 to January 2006. • Quality of supply database implementation in progress • Interconnectors: Zimbabwe-Botswana-South Africa (1995), South Africa-Swaziland-Mozambique (2001), Mozambique-Zimbabwe (1997), Namibia-South Africa (2002), Namibia-Zambia (2006).

  4. Power Pool Overview (2) • Next key activities planned: • Development and implementation of the SAPP competitive electricity market: Jan 2004 to Dec 2007. • Transmission pricing policy, ancillary services market development and implementation procedures: May 2005 to Feb 2007. • Development of a balancing mechanism: June 2007 • Implementation of the SAPP priority generation & transmission projects: From Jan 2006

  5. Upcoming Key Projects in the SAPP (I) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 1 Malawi-Mozambique Interconnector 330kV Malawi and Mozambique TRANS US$ 90 Million March 2007 2 Itezhi-Tezhi [ 120MW ] Zambia HYD GEN US$ 142 Million March 2007 3 Kafue Gorge Lower [ 750MW ] Zambia HYD GEN US$ 600 Million June 2007 4 Inga 1 and 2 DRC REHAB US$452 Million Financing Gap Ready (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

  6. Upcoming Key Projects in the SAPP (II) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 5 Kariba North and South Extensions [360 + 300 MW] These are extension physically joined to the existing facilities. Zambia and Zimbabwe HYD GEN USD 500 Millions Ready 6 Zambia-Namibia-Zimbabwe 330kV Interconnector Namibia, Zambia and Zimbabwe TRANS US$ 200 Millions December 2007 7 Hwange Expansion [ 600 MW ] Zimbabwe DIV GEN US$ 500 Million Ready 8 Kudu [ 800 MW ] Namibia GAS GEN US$ 1,200 Millions Ready (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

More Related