1 / 11
Efficient Clamp Installation Process for Dry Air Cover in Station-1
110 likes | 238 Vues
The dry air cover was successfully installed to improve clamp production and avoid interference issues with screws and voltage readout probes in Station-1, enhancing overall efficiency.
Télécharger la présentation
Efficient Clamp Installation Process for Dry Air Cover in Station-1
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
Octant-7 Clamp Install Octant 7 3710 3710 3710 3711 3711 3711 1-pin type 1A 3712 1B 3712 The dry air cover was successfully installed here 1B 3713 3713
Clamp Production To be installed towards the end of Run11
Improved Layout of Screws New design to avoid interference between screw head and voltage readout probe. Less probe pushing power?
More Related