110 likes | 238 Vues
The dry air cover was successfully installed to improve clamp production and avoid interference issues with screws and voltage readout probes in Station-1, enhancing overall efficiency.
E N D
Octant-7 Clamp Install Octant 7 3710 3710 3710 3711 3711 3711 1-pin type 1A 3712 1B 3712 The dry air cover was successfully installed here 1B 3713 3713
Clamp Production To be installed towards the end of Run11
Improved Layout of Screws New design to avoid interference between screw head and voltage readout probe. Less probe pushing power?