Galesburg CUSD 205

Galesburg CUSD 205. Operation Rebuild - Achievement. Building Standards and Lombard Entry Design Options. Galesburg C USD 205 · PSA–Dewberry · Russell Construction Company · Metzger Johnson

juro
Télécharger la présentation

Galesburg CUSD 205

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Galesburg CUSD 205 Operation Rebuild - Achievement Building Standards and Lombard Entry Design Options Galesburg CUSD 205 · PSA–Dewberry · Russell Construction Company· Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems

  2. Agenda • 1. Pre-Design Sign-Offs • 2. Building Standards • 3. Lombard Entry Design Options • 4. Next Steps Galesburg CUSD 205 · PSA–Dewberry · Russell Construction Company· Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems

  3. Building SectionStudy: Pre-Design Galesburg CUSD 205 · PSA–Dewberry · Russell Construction Company· Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems

  4. Building SectionStudy: King Post Galesburg CUSD 205 · PSA–Dewberry · Russell Construction Company· Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems

  5. Building SectionStudy: Butterfly Galesburg CUSD 205 · PSA–Dewberry · Russell Construction Company· Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems

  6. Building SectionStudy: Starburst Galesburg CUSD 205 · PSA–Dewberry · Russell Construction Company· Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems

  7. Next Steps • Lombard School Core Thu, Aug 18, 2pm • Bldg Comm SD Sign-Off Thu, Sep 9 • BOE SD Sign-Off Mon, Sep 12 Galesburg CUSD 205 · PSA–Dewberry · Russell Construction Company· Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems