1 / 3

Simultaneous DR-EG Resource Audits

Simultaneous DR-EG Resource Audits. ISONE DRWG – February 5, 2014. Straw-man Alternative. Simultaneous resource audits remain a requirement except when a qualifying RTDR dispatch occurs prior to the seasonal audit for a given seasonal performance period

justin
Télécharger la présentation

Simultaneous DR-EG Resource Audits

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Simultaneous DR-EG Resource Audits ISONE DRWG – February 5, 2014

  2. Straw-man Alternative • Simultaneous resource audits remain a requirement except when a qualifying RTDR dispatch occurs prior to the seasonal audit for a given seasonal performance period • In the case of a qualifying RTDR dispatch prior to the seasonal audit: • Participant may select the qualifying dispatch as an audit for the RTDR resource • If so, when the RTEG resource(s) with co-located asset(s) later requests audit, Participant may choose: • Perform simultaneous resource audit (as it works today) or Request audit of DR resource – ATT will automatically request corresponding EG resource • Audit RTEG resource with ONLY co-located RTDR assets Request audit of EG resource – ATT will assume only co-located RTDR assets dispatched • If second option chosen, a new audit record will be established for the co-located RTDR assets along with all of the RTEG assets. Presentation Title

  3. Issue for Consideration and Input • The ISO has raised a concern about how to avoid double-counting performance in the event Customers deliberately do not curtail load for their RTDR Asset in order to inflate the performance of their RTEG Asset • Are there objective criteria to: • Determine if this situation has occurred for a given audit? • If so, adjust/limit EG Asset performance accordingly? Presentation Title

More Related