1 / 6

NOAA/SWPC Agency Talk

NOAA/SWPC Agency Talk. SHINE 2009 D.A. Biesecker. Outline. GOES Status Transition Process ACE Follow-on and Coronagraph. GOES Space Weather Instrument Status. Key Operational Operational with limitations Non-operational Not Applicable. G. Y. R. N/A.

kagami
Télécharger la présentation

NOAA/SWPC Agency Talk

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NOAA/SWPC Agency Talk SHINE 2009 D.A. Biesecker

  2. Outline • GOES Status • Transition Process • ACE Follow-on and Coronagraph

  3. GOES Space Weather Instrument Status Key Operational Operational with limitations Non-operational Not Applicable G Y R N/A * GOES-14 will be reported once operational • GOES-10: De-orbit scheduled for December, 2009 (only working XRS) • GOES-14: launched June 27, 2009 • Test period from July – December, then will be placed in storage • XRS – GOES-14 XRS pointed at Sun Monday Aug 3 and will be made operational in December • EPS –GOES-12 is YELLOW due to noisy electron data and some failed proton channels • SXI – GOES-13 YELLOW due to 8 rows of CCD pixels being damaged – obscures part of solar disk DE-ORBIT DEC 2009

  4. Constellation Update - GOES Satellite is operational beyond design life On-orbit GOES storage Calendar Year As of June 29, 2009 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 GOES 10 Backup GOES 11 GOES - West GOES 12 GOES - East GOES 13 On-orbit Spare GOES O / GOES-14 On-orbit Spare GOES P GOES R GOES S TODAY Operational

  5. Numerical Model Transition Plans • Heliosphere Model: Predict conditions at L1 with 1-4 day lead time • WSA/ENLIL w/CME being transitioned by SWPC w/assistance from D. Odstrcil • Plan to make operational in 2012 Geospace Model: Given L1 data or prediction, predict ground level magnetic variation SWPC has asked CCMC to carry out validation and verification studies on existing models Announced to community in June Started working with modelers at GEM meeting to coordinate agreeable competition standards Yu and Ridley (2008)

  6. Replacing ACE and SOHO/LASCO • NOAA working with NASA and USAF to hopefully fly DSCOVR (formerly TRIANA) • Proposed launch 2013 • Existing Instruments • Magnetometer • Faraday Cup (Plasma) • Proposed addition • Coronagraph

More Related