OPTION 1C – New Building on Case Avenue Site

OPTION SUMMARY. OPTION 1C – New Building on Case Avenue Site. OPTION 2 – Additions and Alterations on Hadley Site. Building Grades: K-6 (includes Headstart & Pre-K Counts) Capacity: 575 FTE Building Size: 98,000 sf No. of Stories: 3 Site Size:

Télécharger la présentation

OPTION 1C – New Building on Case Avenue Site

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPTION SUMMARY OPTION 1C – New Building on Case Avenue Site OPTION 2 – Additions and Alterations on Hadley Site • Building Grades: • K-6 (includes Headstart & Pre-K Counts) • Capacity: • 575 FTE • Building Size: • 98,000 sf • No. of Stories: • 3 • Site Size: • 4.5 Acres (on 17.5 acre Campus with MS/HS) • Building Grades: • K-6 (includes Headstart & Pre-K Counts) • Capacity: • 575 FTE • Building Size: • 92,000 sf • No. of Stories: • 2 • Site Size: • 7.6 Acres (Includes 3.6 acres to be acquired) July 8, 2009

  2. SITE COMPARISON – AERIAL MAPS OPTION 1C – New Building on Case Avenue Site OPTION 2 – Additions and Alterations on Hadley Site July 8, 2009

  3. Option 1c - Case Avenue Site July 8, 2009

  4. Option 1c - New Elementary School on the Case Site Site Plan July 8, 2009

  5. Option 1c - New Elementary School on the Case Site 1 2 3 Library/ Cafeteria Entry Ground Floor Gym Entry Second Floor Main Entry First Floor July 8, 2009

  6. Option 1c - New Elementary School on the Case Site Gym Entry Main Entry Existing Building (to be razed) First Floor Plan July 8, 2009

  7. Option 1c - New Elementary School on the Case Site Existing Building (to be razed) Second Floor Plan July 8, 2009

  8. Option 1c - New Elementary School on the Case Site Library/ Cafeteria Entry Existing Building (to be razed) Ground Floor Plan July 8, 2009

  9. Option 1c - New Elementary School on the Case Site Implementation Advantages • Construct new elementary school to replace Case, sized for enrollment and educational program. • Construct additional space for Headstart and Pre-K Counts program. (some IU classrooms to be located in other district buildings) • Size gymnasium facilities for potential Middle/High School use. • Demolish the current Case Elementary School. • Redevelop the site to use the space formerly occupied by Case for other uses - parking, elementary and possibly middle/high school play areas. • Construction would be phased – Phase one would include majority of educational facilities, Phase two would include Gym, Cafeteria, and Library. • Building would be three stories, building would be built following natural grades. • The new construction can be sized for enrollment and program • Provides convenient use of gymnasium facilities for Middle/High School • Facilitates construction phasing, phase 1 construction can be completed before Case is demolished • Dramatically improves site safety and circulation over what presently exists • Maintains existing K-12 Campus Estimated Cost Disadvantages COST RANGE Low High Construction Cost Renovation (N/A) New Construction (98,000sf at $165 to $175/sf) $16,170,000 $17,150,000 Site Construction (Allowance) $ 850,000$ 1,100,000 Subtotal Construction Costs $17,020,000 $18,250,000 Construction Complexity (Allowance) * $ 500,000 $ 750,000 Design Contingency (3%) $ 510,600$ 547,500 TOTAL Construction Costs $18,030,600$19,547,500 Project Costs Building Demolition (Allowance) $ 700,000 $ 700,000 Construction Contingency (3%) $ 540,918 $ 586,425 Soft Costs (17%) $ 3,065,202$ 3,323,075 TOTAL Project Costs $22,336,720$24,157,000 *Phased construction, remobilization, construction duration, and construction logistics will all make this project somewhat more expensive than building on a bigger, unoccupied site, in one phase. • Uses more of the site during construction, additional congestion during school term for both schools • This option will still require careful planning and construction phasing due to loss of parking area, construction deliveries, worker parking. • Building layout is limited by site size/ conditions • Construction activities will impact operation of the Elementary and Middle/High Schools • More costly than building at Hadley site due to building being all new (no renovations), phased construction, and length of construction duration • Will take longer to complete July 8, 2009

  10. Option 1c - New Elementary School on the Case Site July 8, 2009

  11. Option 2 - Hadley Site July 8, 2009

  12. Option 2 - Elementary School on Hadley Site Site Plan July 8, 2009

  13. Option 2 - Elementary School on Hadley Site First Floor Plan Main Entry Headstart/ Kindergarten Entry Library/ Cafeteria Entry July 8, 2009

  14. Option 2 - Elementary School on Hadley Site Second Floor Plan July 8, 2009

  15. Option 2 - Elementary School on Hadley Site Implementation Advantages • Hadley site size adequate for school and play areas • This option costs less than the other options • The most efficient option in regard to the cost and area/ student • Hadley has an neighborhood scale similar to West Hill and Musser • Site is relatively flat • Acquire former Hadley School property • Construct new additional classrooms and support spaces, renovate and reconfigure Hadley to accommodate the current Case enrollment and educational program • Construct additional space for the Headstart and Pre-K program. (some IU classrooms to be located in other district buildings) • Construct a high school size gymnasium and dressing rooms for Middle/High School use • Develop the site for elementary play areas and community use. Estimated Cost Disadvantages COST RANGE Low High Construction Cost Renovation (28,400sf at $110 to $120/sf) $ 3,124,000 $ 3,408,000 New Construction (65,800sf at $165 to $175/sf) $10,857,000 $11,515,000 Site Construction (Allowance) $ 850,000$ 1,100,000 Subtotal Construction Costs $14,831,000 $16,023,000 Design Contingency (3%) $ 444,930$ 480,690 TOTAL Construction Costs $15,275,930$16,503,690 Project Costs Building Purchase (Hadley Elementary) $ 252,500 $ 252,500 Building Demolition (Case Ave – Allowance) $ 700,000 $ 700,000 Construction Contingency (3%) $ 458,278 $ 495,111 Soft Costs (17%) $ 2,596,908$ 2,805,627 TOTAL Project Costs $19,268,932$20,756,928 • While option provides potential use of gymnasium facilities for the Middle/High School, the site is more remote than options at the Case site • Hadley Site is at the edge of the District July 8, 2009

  16. Option 1c - New Elementary School on the Case Site July 8, 2009

  17. OPTION SUMMARY OPTION 1C – Case Site OPTION 2 – Hadley Site • Building Grades: • K-6 (includes Headstart & Pre-K Counts) • Capacity: • 575 FTE • Building Size: • 98,000 sf • No. of Stories: • 3 • Site Size: • 4.5 Acres (on 17.5 acre Campus with MS/HS) • Construction Duration: • 32 months • No. of Construction Phases: • 2 • Construction Costs (Range): • $18,030,600 to $19,547,500 • Project Costs (Range): • $22,336,720 to $24,157,000 • Building Grades: • K-6 (includes Headstart & Pre-K Counts) • Capacity: • 575 FTE • Building Size: • 92,000 sf • No. of Stories: • 2 • Site Size: • 7.6 Acres (Includes 3.6 acres to be acquired) • Construction Duration: • 20 months • No. of Construction Phases: • 1 • Construction Costs (Range): • $15,275,930 to $16,503,690 • Project Costs (Range): • $19,268,932 to $20,756,928 July 8, 2009