1 / 8

Integrated Logistics Support PROVISIONING PLM++

Integrated Logistics Support PROVISIONING PLM++. Built the Provisioning Master Record and Maintained the Provisioning Data for Sixteen Recent Systems. Experience. Integrated Logistics Support (ILS) Provisioning. Vehicle HMMWV Interim Vehicle-Mounted Mine Detector Cargo Bed Covers

kalin
Télécharger la présentation

Integrated Logistics Support PROVISIONING PLM++

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrated Logistics Support PROVISIONING PLM++

  2. Built the Provisioning Master Record and Maintained the Provisioning Data for Sixteen Recent Systems Experience Integrated Logistics Support (ILS) Provisioning Vehicle HMMWV Interim Vehicle-Mounted Mine Detector Cargo Bed Covers M1 Tank M9 ACE 2 1/2-Ton ESP Tactical Trucks Improved Ribbon Bridge (IRB) Rapidly-Emplaced Bridge (REB) Bridge Erection Boat

  3. Manager with 30 Years Experience Staff Averaging Twelve Years Experience Established, Tested Methodology for Identifying Engineering Changes and Processing Provisioning Data in ECPs and ERRs Develop Test Support Provisioning Reports and Part Manual publications for prototype systems Experience Integrated Logistics Support (ILS) Provisioning

  4. Provisioning On-Line System (POLS) Currently Update/Change HMMWV Data Using POLS Personnel Investigated and Granted Authorization PowerLOG-J Client Oracle Server-Based Software LOGSA-Provided Software Used to Deliver Provisioning Data to TACOM in 1388-2B Format (67,000 plus total records in PowerLOG) RPSTL text developed and deliver from PowerLOG-J Data Sent Via CD-ROM and Email Automated System for Screening Repair Parts SAI Global LOGICOM FEDLOG, LOGRUN/WebFLIS Electronic Delivery of Data Integrated Logistics Support (ILS) Provisioning

  5. AMC inquires how powerLOG and SAP can integrate for examination into PLM++ system AMC PLM community wants us to integrate powerLOG with PLM sys such as WindChill, SAP, etc IETM integration efforts with MIL-STD-40051, GEIA 927-1 and powerLOG, on-going Data Exchange SAP Integrated Logistics Support (ILS) Provisioning

  6. CAPABILITIES Integrated Logistics Support (ILS) Provisioning • ELECTRONIC TECHNICAL MANUALS (ETMs) – MIL-STD-40051 • OPERATOR’S MANUALS • TWO-LEVEL & FOUR-LEVEL MAINTENANCE MANUALS • REPAIR PARTS & SPECIAL TOOLS LISTS (RPSTLs) • NATIONAL MAINTENANCE WORK REQUIREMENTS (NMWRs) • MODIFICATION WORK ORDERS (MWOs) • TECHNICAL BULLETINS • DIGEST ARTICLES/PS MAGAZINE ARTICLES

  7. CAPABILITIES Integrated Logistics Support (ILS) Provisioning • MAINTENANCE ENGINEERING • MAINTENANCE PLANNING (TWO-LEVEL/FOUR-LEVEL) • RELIABILITY-CENTERED MAINTENANCE (RCM) • MODIFICATION KIT DEVELOPMENT • MANPRINT ANALYSIS • BDAR • ISODRAW ILLUSTRATION SYSTEM WITH CAD INTERFACE TO DESIGN ENGINEERING

  8. CAPABILITIES Integrated Logistics Support (ILS) Provisioning • INTERACTIVE ELECTRONIC TECHNICAL MANUALS (IETMs) • Class IV and V Diagnostics with SPORT/MSD Interface • POINT-TO-POINT INTERACTIVE SCHEMATICS

More Related