Term project #3 I.E 200427140 BJ Song 200527106 EH Kang 200527151 YJ Ann 200527185 HI Choi
Contents 04 05 The existing facilities 01 02 Problem and assumption 03 Proposal SLP Plan Presentation Title
01 the existing facilities sewing machine obaroque Assistance table lounge cutting iron storage hoist 원단 부자재창고 Presentation Title 1
01 Common process Upper pants the existing facilities Operation Sequence – open type (upper)painting sewing machine (face) storage cutting obarocu Sewing machine (zipper) Sewing machine (Inter) Dac-ccu (rubber-band) packing (laber) Iron Presentation Title 6
01 Common process Upper pants the existing facilities Operation Sequence – zipper type sewing machine (face) (upper)painting storage cutting Dacccu(rubber-band) Sewing machine (zipper) Sewing machine (Inter) packing(laber) Irong Presentation Title 1
01 (upper)painting sewing machine (face) storage cutting Sewing machine (Inter) packing (laber) Dac-ccu (rubber-band) Irong Common process Upper pants the existing facilities Operation Sequence – round type obarocu Presentation Title 6
01 sewing machine obaroque Assistance table lounge cutting iron storage hoist the existing facilities Presentation Title 1
02 Problem and assumption • Complicated procedure Simplification of process • Mass production – Inappropriateness of process layout • - Movement distance is long • Movement distance is straight line and short • - Complicated production control • Easy to understand the rate of progress • - Increment of stock • Shortened stock Presentation Title 1
02 Problem and assumption • Restroom, storage, entrance is fixed • Machine is moved with table Presentation Title 1
03 • Mass production • Simplification of process • solution of process layout • problem P Product layout Q Proposal Presentation Title 1
03 Sewing machine (face) Dac-cuu (rubber band) Sewing machine (inter) Sewing machine (zipper) obaroque Proposal Product layout - straight • unused Assistance table. • Iron, cutting, hoist, packing are fixed. lounge cutting iron storage hoist Presentation Title 1
03 Sewing machine (face) Dac-cuu (rubber band) Sewing machine (inter) Sewing machine (zipper) obaroque Proposal Product layout - group • 1 Assistance table. • Iron, cutting, hoist, packing are fixed. lounge Assistance table cutting iron storage hoist Presentation Title 1
03 Sewing machine (face) Dac-cuu (rubber band) Sewing machine (inter) Sewing machine (zipper) obaroque Proposal Straight • unused Assistance table. • Iron, cutting, packing are moved. iron cutting lounge storage hoist Presentation Title 1
04 SLP Extended part list Presentation Title 1
04 Storage A Cutting X U X A Painting U E X U X Sewing (face) U U X U U E U X U X Obaroque X E E X X E X X Dac-cuu U U E X X E X X Sewing (inter) X X E Sewing (zipper) X X X E Irong X E Packing SLP Activity Relationship Chart Presentation Title 11
05 plan New arrangement by using the SLP method Cost Analysis Presentation Title 11