In the recent FAST Site meeting, Eric Takasugi from UCLA shared updates on the current status of testing at the site. A new chamber is operational and testing has commenced with two tests passed and one failed. The tests included Slow Control and AFEB connectivity assessments. Additionally, new ALCT firmware has been loaded onto several chambers, with plans for further deployments post-meeting. Continuous monitoring and improvements are underway to ensure robust performance and integration of the systems.

karim
Télécharger la présentation

FAST Site Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FAST Site Update Eric Takasugi UCLA ME 4/2 Meeting

  2. FAST Site Status • New chamber in place (203) • Testing has begun • Pass on 2 tests • 9, Slow Control Test • 13, AFEB Threshold and Analog Noise Test • Fail on 1 test • 12, AFEB Connectivity and Noise Test ME 4/2 Meeting

  3. Otherwise • DOC Shift • Loaded some new ALCT firmware on a few of the chambers • Plan to load the new ALCT firmware onto more chambers after tomorrow ME 4/2 Meeting