1 / 17

BABAR

BABAR. IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING. DETECTOR LAYOUT EXPLODED. DETECTOR LAYOUT ASSEMBLED. IAROCCI TUBE. TUBE MATERIAL : NORYL OR PVC THE TUBE IS NOT SELF SUPPORTING. RIB. RIB MATERIAL : STEEL

Télécharger la présentation

BABAR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING V. Carassiti - Princeton (USA) 9-13/01/2003

  2. DETECTOR LAYOUTEXPLODED V. Carassiti - Princeton (USA) 9-13/01/2003

  3. DETECTOR LAYOUTASSEMBLED V. Carassiti - Princeton (USA) 9-13/01/2003

  4. IAROCCI TUBE TUBE MATERIAL : NORYL OR PVC THE TUBE IS NOT SELF SUPPORTING V. Carassiti - Princeton (USA) 9-13/01/2003

  5. RIB • RIB MATERIAL : STEEL • NUMBER OF RIBS : TO BE OPTIMIZED DEPENDING ON DETECTOR’S EFFICIENCY AND STIFFNESS REQUIRED • ASSUMING A RIB OF 1 MM THICK FOR EACH TUBE, THE TOTAL LENGTH NEEDED IS ABOUT 8000 m; THE CORRESPONDING WEIGHT IS 1260 Kg AND THE COST = 3.6*1260 = 4536 € (20% VAT INCLUDED) V. Carassiti - Princeton (USA) 9-13/01/2003

  6. DETECTOR’S STIFFNESSTHE HELP OF THE RIBS V. Carassiti - Princeton (USA) 9-13/01/2003

  7. GLUEING – PHASE 1 THE RIB IS GLUED ON THE TUBE’S SIDE V. Carassiti - Princeton (USA) 9-13/01/2003

  8. GLUEING – PHASE 2 • THE DETECTOR’S MODULE IS ASSEMBLED V. Carassiti - Princeton (USA) 9-13/01/2003

  9. GLUEING – PHASE 3 • STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE ASSEMBLED • THE TOTAL THICKNESS IS ABOUT 1 MM V. Carassiti - Princeton (USA) 9-13/01/2003

  10. GLUEING – PHASE 4 • STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE GLUED ON THE TUBES V. Carassiti - Princeton (USA) 9-13/01/2003

  11. DETECTOR’S VERTICAL STIFFNESS V. Carassiti - Princeton (USA) 9-13/01/2003

  12. MOUNTING AND DISMOUNTING THE DETECTOR • THE STRIPS FOIL GOES IN TO THE GAP (SLIDE 13); A PROPER TOOLING KEEPS IT IN SHAPE AND PLACE • THE MODULES OF THE DETECTOR ARE INSERTED ONE BY ONE FROM THE BOTTOM TO THE TOP, THE NEXT SLIDING ON THE PREVIOUS ONE (SLIDES 14, 15) • EACH MODULE CAN BE HELD ON BOTH EDGES, WHICH ALLOWS THE LIFTING AND THE ADJUSTMENT. • WHEN THE CORNER PIECES ARE MOUNTED THE DETECTOR DISASSEMBLY IS STILL POSSIBLE AFTER THE CENTER PIECES REMOVAL (SLIDE 16); THE PROCEDURE IS THE FOLLOWING: 1) LIFTING THE UPPER MODULES 2) EXTRACT THE CENTRAL MODULES 3) IN THE MIDDLE OF THE GAP THERE’S THE SPACE TO LOWER OR LIFT THE OTHER MODULES.AND REMOVE THEM. • THE OPERATION OF ASSEMBLY AND DISASSEMBLY NEED A TOOLING, HOLDING AND HANDLING THE MODULES OF THE DETECTOR. V. Carassiti - Princeton (USA) 9-13/01/2003

  13. INSERTING THE STRIP FOIL • THE STRIP FOIL SLIDES INTO THE GAP • A TOOLING HOLDING AND MOVING THE FOIL IS NEEDED V. Carassiti - Princeton (USA) 9-13/01/2003

  14. INSERTING THE DETECTOR - 1 V. Carassiti - Princeton (USA) 9-13/01/2003

  15. INSERTING THE DETECTOR - 2 V. Carassiti - Princeton (USA) 9-13/01/2003

  16. EXTRACTING THE DETECTOR V. Carassiti - Princeton (USA) 9-13/01/2003

  17. THE LAYER IN PLACE V. Carassiti - Princeton (USA) 9-13/01/2003

More Related