Project Execution Planning for Building Information Modeling

DESCRIPTION

Project Execution Planning for Building Information Modeling. Progress Meeting #4 – October 31 st , 2008. A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction Industry Institute (CII) Penn State Office of Physical Plant (OPP) PACE.

1 / 19

Download Presentation
Télécharger la présentation

Project Execution Planning for Building Information Modeling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Execution Planning for Building Information Modeling Progress Meeting #4 – October 31st, 2008 • A buildingSMART Alliance project sponsored by: • The Charles Pankow Foundation • Construction Industry Institute (CII) • Penn State Office of Physical Plant (OPP) • PACE

  2. Conference Call Agenda Introductions Project Overview Progress Report Discussion of Project and Progress Set Up Next Meeting Time

  3. Team Members • Board of Advisory • Deke Smith – Executive Director of buildingSMART Alliance (Industry Champion) • Victor Sanvido – Ph.D., Senior Vice President, Southland Industries • Francois Grobler – Ph.D., US Army CERL and IAI - North America • Steve Hagan – Project Knowledge Center, U.S. General Services Administration • SoadKousheshi – President, AEC Strategy • Ed Gannon – Manager of Design Services, Penn State Office of Physical Plant • Mark Falzarano – Barton Malow Company • Mark Butler – HDR • Derek Cunz– Director of Project Development, Mortenson Construction • Mark Konchar- Vice President – Balfour Beatty Construction • CIC Research Program Team Members • John Messner – Director of the CIC Research Program • ChimayAnumba – Professor and Head of Architectural Engineering • Sam Hunter – Assist. Professor of Psychology • Craig Dubler – PhD Student, Architectural Engineering (Construction) • Colleen Kasprzak – MS Student, Architectural Engineering (Operations) • Chitwan Saluja – MS Student, Architectural Engineering (Planning) • Nevena Zikic – MS Student, Architectural Engineering (Design) • Shane Goodman – BAE/MAE Student, Architectural Engineering • Sponsor Represenatives • Bob Tener – Director, The Charles Pankow Foundation • Steve Thomas – Director of Research, The Construction Industry Institute

  4. Project Overview • Identify BIM methods and implementation strategies organized by project phase • Planning, Design, Construction, Operations • Develop implementation guidelines and best practice methods • Disseminate the results • BIM Execution Planning Guide • Interactive execution planning computer tool • Presentations at national conferences e.g. buildingSMART, AIA, AGC BIMForum, etc. • Articles in industry and academic publications

  5. Progress Report • Continuously developing concept for BIM Execution Planning Process. • Wrapping-up Interview process. • Conducted focus group discussion at PACE (10.16.2008) • Reviewing additional resources with similar scopes for collaborative efforts and/or additional value to our guide. • BIM Ex Class • Developed BIM uses on wiki through interviews and lit review • Currently investigating case study projects

  6. Design Communication System Analysis Estimation Scheduling Plan • Existing Conditions • Modeling • Programming • Site Selection • Preliminary Cost Estimation • Phase Planning Design • Design Authoring • Design Reviews (Constructability, 3D Design Coordination, Virtual Mock-ups) • Site Analysis • Engineering Analysis (Structural, Energy, Lighting , CFD, IAQ Evaluation, Thermal Performance) • Code Validation (Emergency Evacuation, Security Analysis) • LEED Evaluation • Cost Estimation • Phase Planning (Tenant Fit-out) Construct • 3D MEP Coordination • Digital Fabrication • 3D Control and • Planning • 3D System Design • Unit Price Estimating • 4D Planning • Site Utilization Planning Operate • Record Model • Asset Management • Space Management/ • Tracking • Disaster/Emergency • Planning • Building Performance Analysis • Maintenance Cost Estimation • Building Maintenance • Renovation Coordination

  7. BIM USE from WIKI CLICK HERE (Link to WIKI)

  8. Execution Planning Process Concept: “Begin with the End in Mind” Operation Construction Design Planning D S E S D S E S D S E S D S E S First Pass = Use Operation Construction Design Planning D S E S D S E S D S E S D S E S Second Pass = Who creates it? What Platform?

  9. Execution Planning Process Project X BIM Execution Plan

  10. Execution Planning Categories

  11. BIM USE Identification Prototype CLICK HERE

  12. BIM Use Identification Process Project Input Project Characteristics + BIM Objectives Decision Support Tool Decision Matrix BIM GOALS

  13. Design Support System: Matrix Model

  14. Next Tasks • Develop detailed execution planning process model • Complete the content analysis of interviews for each phase and for BIM uses • Perform Case Studies • Develop detailed list of content for BIM Execution Plan • Identify next focus group locations • buildingSMART Alliance Conf (?) • PACE Seminar in Spring 09

  15. Example: Interview Content Analysis

  16. Additional Resources • Autodesk Communication Specifications • AIA BIM Exhibit • AGC Guide to BIM • Australian BIM National Guidelines • Key success factors for adopting BIM (Gang Lee) • Board Members: • Feel free to add more if they come to mind.

  17. Discussion • Ways that you can help us: • Feedback: • BIM Uses (posted at bimex.wikispace.com) • Process overview / format • Identify potential case study projects for BIM Execution Planning course • Projects to test drive BIM Execution Plan Process • Share BIM Execution Plans if you have them and can share them

  18. Thank You • Next Meeting Time? • Video conferencing during meetings – need friend of PSU Account • SIGN UP HERE: • https://fps.psu.edu/mkuser/index.html