1 / 9

New Plant Configuration Management Development and Implementation Process

John Maciejewski INPO. New Plant Configuration Management Development and Implementation Process. June 29, 2009. New Plant Configuration Management Development and Implementation Process. Reasons for development: INPO AP-929 developed based on modifications/changes to an existing plant

keelia
Télécharger la présentation

New Plant Configuration Management Development and Implementation Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. John Maciejewski INPO New Plant Configuration Management Development and Implementation Process June 29, 2009

  2. New Plant Configuration Management Development and Implementation Process • Reasons for development: • INPO AP-929 developed based on modifications/changes to an existing plant • Extensive use of computer technology for new plant deployment • Benchmarking international projects revealed significant use of computer technology in providing CM • Recommendations from several CNO’s • Use by other industries of relational databases to control information

  3. New Plant Configuration Management Development and Implementation Process • Document sections: • Configuration management program attributes • Process description is for new plant deployment (not operation) • Includes incorporating information needed for operation and a description of linking information using relational databases

  4. New Plant Configuration Management Development and Implementation Process • Concepts • CM development starts early in the design phase • Design is essentially complete prior to construction • Computer technology is used extensively in design ( 3-D model, data bases) • Computer technology supports development of a detailed design that can be built. • The plant is built as designed. Changes are only made because of errors in design.

  5. New Plant Configuration Management Development and Implementation Process • CM attributes for pre-commercial operation • A listing of CM attributes for design and construction that will enable establishment of effective CM

  6. New Plant Configuration Management Development and Implementation Process • Process elements: • Determine CM scope and information • Establish an electronic platform and standard format • Electronically link related information • Enter information into the computer • Produce information for construction • Build the plant per the design (correct errors only) • Turnover the computer databases and physical plant to COL holder

  7. New Plant Configuration Management Development and Implementation Process • Using the component designator as the common relationship • Using a common electronic platform/framework, design information can be linked electronically to the related components and other related information using the component designator. • For example the component designator (e. g., MOV-XX) is the common relationship for relating information. • Design information and information based on design information should be linked.

  8. Summary • An INPO document for new plant CM development and implementation is in preparation • Concepts are based on CM lessons learned and recent benchmarking • Incorporates computer technology as a tool for CM

  9. Questions?

More Related