An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Service Work Committee ReportP. Rossi • Service Work: maintenance and general analysis work that needs to get done for CLAS & work for CLAS12 • Each full/term member must take a portion of this load as a condition of continued membership. A rough guide is in the range of 1/4 MEMBERS of the Committee: Phil Cole Paul Eugenio Franz Klein Silvia Niccolai Patrizia Rossi (chair) Steffen Strauch Mike Vineyard * * Mike will be leaving the CLAS collaboration effective June 1, 2009 Need a new member in the committee CLAS Collaboration Meeting February 28, 2009

  2. 1 new institution Total = 34 institutions ~ 160 members  ~ 40 FTE

  3. HARDWARE 3.8 SOFTWARE 10.4 CALIBRATION 12.0 COOKING 6.3 ON CALL 0.9 COMMITTEE 2.3 PAPER Rev. 4.1 RUN COOR. 0.8 OTHER 1.1 HARD_CLAS12 15.6 SOFT_CLAS12 7.2 OTHER_CLAS12 0.7 HARDWARE 4.5 SOFTWARE 6.6 CALIBRATION 8.1 COOKING 4.6 ON CALL 0.5 COMMITTEE 2.1 PAPER Rev. 1.0 RUN COOR. 1.0 OTHER 0.4 HARD_CLAS12 20.7 SOFT_CLAS12 6.7 OTHER_CLAS12 0.5 2008 CLAS12 CLAS12 2009 ____ 65,2 ____ 56.7 CLAS12 36% FTE CLAS12 49% FTE

  4. HARDWARE 3.8 SOFTWARE 10.4 CALIBRATION 12.0 COOKING 6.3 ON CALL 0.9 COMMITTEE 2.3 PAPER Rev. 4.1 RUN COOR. 0.8 OTHER 1.1 HARD_CLAS12 15.6 SOFT_CLAS12 7.2 OTHER_CLAS12 0.7 2008 CLAS12 CLAS12 HARDWARE 4.1 SOFTWARE 8.9 CALIBRATION 11.2 COOKING 3.6 ON CALL 1.5 COMMITTEE 2.1 PAPER Rev. 0.4 RUN COOR. 1.6 OTHER 0.3 HARD_CLAS12 15.9 SOFT_CLAS12 5.2 OTHER_CLAS12 1.3 2008_estimated ____ 65,2 ____ 56.1 65,2 FTE 56,1 FTE

  5. summary • The committee found an overall satisfactory service work commitment of the institutions • Few institutions require some paper reviews to fulfil their service work (list will be sent to the coordinating committee) • 7 institutions out of 34 don’t have any commitment for CLAS12 • SWC reviews of the SoS will be posted next week in: • http://www.jlab.org/Hall-B/secure/sos/sos-09/SoS_review/