An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Xbar Chart Farrokh Alemi, Ph.D.

  2. Why Chart Data? • To discipline intuitions • To tell a story

  3. Steps to create an X-bar chart? • Check assumptions • Calculate grand average • Calculate standard deviation • Calculate standard deviation for each time period • Calculate control limits • Plot chart • Interpret and distribute

  4. Example Data • Over several months, we tracked the satisfaction with our unit. • The question is whether the unit has improved over time.

  5. Are variations due to chance? • How would you answer this question? Look at the data. • There are wide variations in the data. Could these variations be due to chance? • The first step is to calculate the average for each time period.

  6. 1. Check Assumptions • Continuous Interval Scale • Independent events • Normal distribution • Constant variance

  7. 2. Calculate Grand Average • Average values for all time periods and all cases, plot as a line

  8. 3. Calculate standard deviation Calculate standard deviation for all observations S = [i=1,…,nj j = 1, …m (Xij-GA)2 / (n-1)]0.5GA is grand averagen is number of observations across time periods

  9. 4. Calculate standard deviation for each time period Estimate the standard deviation for each time period St = S / (nt)0.5

  10. 5. Calculate Control Limits UCL = GA + 1.96 * St LCL = GA – 1.96 * St • 1.96 sets the limits so that 95% data fall within the two limits • GA is the grand average • St is the standard deviation for the time period

  11. Constant for 95% confidence limits Grand average Standard deviation function over range of all observations =Average(B2:E2) =Average($B$2:$E$5) Dividing by square root of number of observations in the time period Calculations in Excel

  12. 6. Plot Control Chart

  13. 7. Interpret findings & distribute • First time period is above UCL • Second time period below LCL