1 / 8

Foundation-Based Operations Management Authority Army Geospatial Conference 4 May 2005

2. Purpose. Integrate Foundation-Based Operations (FBO) activities to enable GEOINTFoundation-based Operations (FBO)

kemp
Télécharger la présentation

Foundation-Based Operations Management Authority Army Geospatial Conference 4 May 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Foundation-Based Operations Management Authority Army Geospatial Conference 4 May 2005

    2. 2 Purpose Integrate Foundation-Based Operations (FBO) activities to enable GEOINT Foundation-based Operations (FBO) The standards, processes, and resources for producing and managing integrated global GEOINT to meet customer specific needs. FBO includes the ability to populate and maintain content with surge capability and capacity. GEOINT The exploitation and analysis of imagery and geospatial information to describe, assess, and visually depict physical features and geographically referenced activities on the Earth Fusion of geospatial information, imagery, and imagery intelligence

    3. 3 Background Geospatial Transition Plan Geospatial information layers in the GKB Readiness & Responsiveness Strategy NGA not currently meeting commitments for production of geospatial data and information NSG Operational Requirements Document Key Performance Parameters 6 & 7 NGA and the birth of GEOINT Geospatial intelligence Assessment Activity Geospatial Data Summit Recommendation to Directorstand up a Management Authority

    4. 4 Background (cont.) Management Authorities Chartered by Director Managed by the Office of Geospatial-Intelligence Functional Management Limited duration: six to 12 months Address a specific theme or problem set Focus on particularly intractable issues Advanced Geospatial Intelligence Airborne Integration Commercial Remote Sensing Delivers a Strategic Implementation Plan (SIP) Defines responsibilities, levies accountability

    5. 5 FOMA Methodology Develop Terms of Reference Defines the scope of the effort Determine the As-Is Baseline Documents current FBO activities where we are today Develop To-Be Vision Integrates the GEOINT information environment Action Matrix Portrays the deltas between where we are (as-is) and where we want to go (to-be) Strategic Implementation Plan The way aheadan actionable investment plan Monitor and measure progress on SIP

    6. 6 Key Elements for FOMAs Success Strengthened GEOINT requirements process Information-based vice product More immediate feedback and status Production planning and management Leverage customer and partner interaction: Unified GEOINT Operations Incorporation of value-added data into GKB Needed for future, high-fidelity data and analysis Cant get there from here without it Cant afford not to Technology Requirements and Production management and planning Conflation, data management, feature generalization Mechanism for accountability and performance measurement Standards Symbology, specifications, view generation, mission applications

    7. 7 Data Content Specification provides guidance currently in development. Must have an integrated method for identification and tracking of mission needs & requirements. Multiple data sources will populate the database Integrated information environment we need a common set of definitions for content.Data Content Specification provides guidance currently in development. Must have an integrated method for identification and tracking of mission needs & requirements. Multiple data sources will populate the database Integrated information environment we need a common set of definitions for content.

    8. 8 Integrated Schedule GSMA/FOMA

More Related