An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meeting for RLIUP prepration - Lucio Rossi Review of Master plan:PIC – US1 – US2 list

  2. PIC – 1st • IR (Interaction Region) • IT , 150 mm aperture in P1 and P5 • TAS, 60 mm (beam pipe? Absorbers) • D1, 150 mm • Correctors for IR (MCBX and HO): 150 mm • New cryoplants for IRssized for new MSsincludingCCCscryoseparation/connectionfrom Arc • New powering of IR magnetswith EPC and DFBs on surface + SC links • New poweringwith SC links at P7 (RR) • New Cryoplant P4 for SCRF (TBC) Lumi Availabilty Lumi Availabilty ALARA, R2E Availabilty  Space ALARA Availabilty

  3. PIC – 2nd Lumi Availabilty • Collimators (all with buttons) • New collimatorsin IR (change of aperture)New collimators for INJ (6/beam) • Secondary in Mo for lowbeam ZAll 19/beam or lessjust to seeeffect? TBD deeply • RF? • Beam diagnostics • CryoBLMs (link to triplet) • BLM - Rad Hard Electronics (IR3 / IR7 / LSS) ~300 BLMs • FastVacuum Wire Scanners (Initial R&D paid by LIU) • New BPMs Q1 to Q5 (4 directionalcouplers & 6 BPMs = 40 total + 10 spares) • Upgrade Synchrotron Light Monitor + NEW Beamgas vertex detector • TDI and kickers (probably not) • Remote handling ? Availabilty Lumi Availabilty

  4. US1 -1st (2000 fb-1) • MS remodelling? How much? • Change magnetsatlowcost (samecryo &EPC) • (collaboration with CEA…) • Change only positions to partially profit of large ITs? • Require MS global change as needed for US1 goal? • Can wekeepthe present D2 ? • SC links to remove EPC and DFB of MS: do weneeditfor US1? • Collimation • Secondary in Mo: all necessary for US1? • DS collimation: isnecessary for US1 beam ?

  5. US1 – 2nd • LRBB CW: do weneedhere? • Beam Diagnostics • Lumi monitor • Second undulator/beam • RF? • TDI & Kickers ?

  6. US2 – 1st • MS remodelling • New D2, Q4 , Q5, • New cryogenicsform new IR plant witzh full redundancy (also for ATLAS and CMS plant?) • EPC and DFB removed • CCC • In the // plane • Also in  plane ? • Collimation : complete plan • DS collimation in P7 and …(P3?, P1+P5?) • Crystal Coll?

  7. US2 – 2nd • LRBB WC : all • Diagnostics ? • Halo control/monitor? (e-lens?) • TDI & Kickers ? • Remote Handling