Miami-Dade County’s ATMS Upgrade Success with Embedded Integrators

Miami-Dade County’s ATMS Upgrade Success with Embedded Integrators. Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by K. K. Saxena, Senior Vice President, Kimley -Horn and Associates, Inc. Jim Reynold, PE, Kimley -Horn and Associates, Inc.

keran
Télécharger la présentation

Miami-Dade County’s ATMS Upgrade Success with Embedded Integrators

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Miami-Dade County’s ATMS UpgradeSuccess with Embedded Integrators Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by K. K. Saxena, Senior Vice President, Kimley-Horn and Associates, Inc. Jim Reynold, PE, Kimley-Horn and Associates, Inc. Robert Williams, PE PTOE, Miami-Dade County

  2. Background Miami-Dade’s Urban Traffic Control System UTCS) • Installed mid-70s • Funded by FHWA, FDOT, and local bonds • Largest central computer control system in the U.S. at inception • Reached maximum capacity of 2,048 signals mid-80s

  3. LEGEND KHA KHA / TSS TSS Traffic Operations Engineering Contractor TSS Maintenance Bellsouth Miami-Dade ATMS Deployment Steps Automated Intersection Database Conversion • T & S Engineering Verification & Adjustments Equipment Procurement (Controller Only) Equipment Procurement (Cabinet/Controller) • Controller/Firmware Installed and Tested • (TSS Maintenance or Contractor) Equipment Procurement (Controller Processor Board) Equipment Procurement (Conflict Monitor) Equipment Procurement (Modems) • Intersection On-Line & Under ATMS Control • BellSouth Communications Links • Conduit Repair Completed Conduit Verification • Prepare Service Order for BellSouth Communications

  4. Embedded Integrators • MDC Project Management (2) • Contractor Field equipment installation (12) • AT&T communications provisioning (6) • MDC maintenance & testing teams (18) • Contractor Construction engineering and Inspection (20) • MDC Timing Engineers (10) • MDC System Operators (10) • Consultants Imbedded Integrators (3)

  5. Embedded Integrator ApproachBenefits and Lessons Learned • Cost Effective: System Integrator coordinates and guides all work but leverages County resources • Excellent training method to all County staff • Smooth migration from old to new system • Saved deployment time • Flexible enough to respond to changing operational needs