ITRC (Interstate Technology & Regulatory Council) is a state-led coalition dedicated to advancing innovative environmental technologies. With a mission to break down barriers to the acceptance of sound environmental solutions, ITRC focuses on developing resources, enhancing collaboration, and improving regulatory processes. By providing training and guidance, ITRC fosters better decision-making and increases confidence in innovative approaches, resulting in harmonized regulations across states, reduced compliance costs, and expedited environmental clean-up efforts.
E N D
Advancing Environmental Solutions How ITRC Reduces Regulatory Barriers to Innovative Environmental Technologies
What is ITRC? ITRC is a state-led coalition working to advance the use of innovative environmental technologies and approaches. ITRC translates good science into better decision making
ITRC Values Integrity Consensus Technical Excellence Innovation Change Partnership Collaboration
ITRC Purpose & Mission • ITRC Purpose To advance innovative environmental decision making • ITRC Mission Develop information resources and help break down barriers to the acceptance and use of technically sound innovative solutions to environmental challenges through an active network of diverse professionals
ITRC Key Strategies • ITRC looks ahead to future environmental challenges and is ready to focus our resources on developing innovative solutions to address those challenges. • ITRC develops quality products that meet the needs of our customers. • ITRC conducts outreach to demonstrate our value and increase our visibility to funding sponsors. • ITRC emphasizes collaboration and cooperation in our work as a way to foster consensus.
ITRC’s Role Innovative Technologies and Approaches Barriers to use: • Lack of knowledge/trust • Differing procedures • Pre-specified approaches • Institutional resistance • Faster acceptance of innovative technologies • Better decision making • Reduced permitting/review time • Decreased compliance costs • Harmonized state approaches
What ITRC Does Select Projects FormTeams Implement Solutions Develop Documents and Training Conduct Training ITRC uses a proven, cost-effective approach to develop guidance documents and training courses Since 1995: 106 documents 68 training courses
Typical Project Schedule Reviewed by all membership sectors
ITRC Topics – Past and Present • New contaminated site assessment technologies • New cleanup processes and approaches • Emerging contaminants (e.g. perchlorate) • Munitions and explosives of concern (e.g. UXO) • Vapor intrusion • Green and sustainable remediation • Contaminated sediments • Remedial process optimization • Risk assessment • Mining waste
2012 ITRC Teams • Incremental Sampling Methodology (ISM) – CLOSING 2012 • Environmental Molecular Diagnostics (EMD) –CLOSING 2013 • Biochemical Reactors for Mine Influenced Water • Contaminated Sediments – Remediation • Groundwater Statistics and Monitoring Compliance • DNAPL Site Characterization – NEW • Geophysical Classification for Munitions Response – NEW • Petroleum Vapor Intrusion – NEW • Risk Assessment – NEW
2013 ITRC Teams • Environmental Molecular Diagnostics (EMD) –CLOSING 2013 • Biochemical Reactors for Mine Influenced Water • Contaminated Sediments – Remediation • Groundwater Statistics and Monitoring Compliance • DNAPL Site Characterization – NEW • Geophysical Classification for Munitions Response – NEW • Petroleum Vapor Intrusion – NEW • Risk Assessment – NEW
ITRC Has Impact • National network with members from 50 states • Published 109 documents • Developed 71 training classes • Trained 90,000 people • ITRC’s website gets 8,000 to 10,000 unique visitors per month • Estimated 500-1,000 documents viewed or downloaded per month • Hundreds of success stories • Documented cost savings in the hundreds of millions of $
ITRC Reduces Barriers By • Providing guidance and training developed for state regulators by state regulators • Increasing understanding and confidence in innovative technologies • Fostering integration of new technical developments within existing regulations • Showing the cost and time savings that can be achieved with innovative environmental technologies • Creating networks of technical experts for use by states when making decisions on innovative environmental technologies
Specific Benefits • National paradigm shifts for using new technology • Harmonized approaches to using innovative technology across the nation • Increased regulatory consistency for similar cleanup problems in different states • Reduced review/permitting times for innovative approaches to environmental problems • Faster cleanup decisions due to reduction in uncertainty • Decreased compliance costs
2011 Geographic Distribution of State Membership 1-2 members 10 + members 5-9 members 3-4 members 0 members 75% of states have 2 or more members
2012 Industry Affiliates Program (IAP) • 77 IAP members, revenue is $556,000
ITRC Training See www.itrcweb.org for full schedule Internet Based Training FREE Classroom Training
LNAPLs: Science, Management, and Technology (Classroom Training) Oct. 2011 - Minneapolis, MN - 99 trained April 2012 - Boston, MA - 192 trained Fall 2012 – Novi, MI – 195 trained April 2013 – King of Prussia, PA June 2013 – Springfield, IL October 2013 – Garden Grove, CA Course Overview • Develop and apply an LNAPL Conceptual Site Model • Understand and assess LNAPL subsurface behavior • Develop and justify LNAPL remedial objectives including maximum extent practicable considerations • Select appropriate LNAPL remedial technologies and measure progress • Use ITRC’s science-based LNAPL guidance to efficiently move sites to closure
Vapor Intrusion (Classroom Training) 2,000 people trained in an intensive two-day course: “Vapor Intrusion Pathway - A Practical Guideline” Course Overview • How to conduct site screening and investigations • How to collect quality data and evaluate the results • How to apply multiple lines of evidence to ensure quality decision making • Understanding and implementing mitigation options
Select 2013 ITRC Courses • Attenuation Processes for Metals and Radionuclides • Biofuels • Contaminated Sediments – Bioavailability • Green and Sustainable Remediation • Incremental Sampling Methodology • Integrated DNAPL Site Strategy • LNAPLs • Mass Flux • Mining Waste • Remediation Risk Management • Risk Assessment • Solidification/Stabilization See www.itrcweb.org full schedule
State Engagement Network • ITRC is led by state agency representatives through its Board of Advisors • States become official members of ITRC by appointing a Point of Contact (POC). The POCs: • Facilitate communication within the state • Identify state priorities and emerging issues • Coordinate state review of draft documents and dry run training • Promote use of ITRC documents and training within the state • Each ITRC Team is led by 1-2 state agency Team Leaders and has a minimum of 5 state agency team members
State Engagement Over 15 Years 1995 2005 ITRC Member 2000 2011
State Engagement Update • In 2013, 48 states have confirmed Points of Contact (POCs) • POCs: • Review ITRC documents • Submit state environmental priorities to ITRC • Respond to survey requests • Indicate expected level of participation in ITRC proposed projects • Participate in training dry runs • Contribute to project technical and implementation sessions • Submit ITRC success stories • Recruit state Team Leaders and members for ITRC Teams • Provide state concurrence on ITRC technical regulatory guidance documents
Benefits to States • Information and technology transfer – states make ITRC guidance their own • Free training and knowledge on how to use innovative environmental technologies/approaches • Access to peers and experts in other regulatory agencies • Shortened learning curve by obtaining advance knowledge of innovative technologies/approaches • Cost-effective involvement in demonstrations conducted in other jurisdictions • Sounding board for problem solving • Leadership and professional development
Federal Government Participation • ITRC partners with U.S. government agencies: • Environmental Protection Agency (EPA) • Department of Defense (DOD) • Department of Energy (DOE) • Collectively EPA, DOD, and DOE: • Have partnered with ITRC since 1995 • Are members of the ITRC Board of Advisors • Provide about 75% of ITRC’s yearly budget • Provide peer review of ITRC documents and training courses • Provide technical experts for ITRC teams • Provide instructors for ITRC training courses • Play an active role in future project selection • Take ITRC training courses
Benefits to DOD and DOE • Encourages use of innovative environmental solutions • Increases reliance on cost-effective cleanup approaches • Reduces review and approval times for innovative approaches to environmental problems • Facilitates interactions between federal managers and state regulators • Increases consistency of regulatory requirements for similar cleanup problems in different states • Can help reduce uncertainties when preparing cleanup plans • Addresses DOD and DOE unique environmental needs (e.g. munitions, radionuclides, chlorinated solvents)
Benefits to EPA • Provides knowledge transfer to states for better environmental protection • Encourages use of innovative environmental solutions by states and others • Increases state reliance on cost-effective cleanup approaches • Facilitates idea sharing between federal managers and state regulators • Provides a mechanism for identifying and integrating regulatory performance expectations among states • Unique and cost-effective approach for demonstrating and deploying new technology/approaches
Private Sector Participation The private sector: • Has partnered with ITRC since 1995 • Is part of the ITRC Board of Advisors • Provides about 20% of the ITRC’s yearly budget • Provides peer review of ITRC documents and training courses • Provides technical experts for ITRC teams • Provides instructors for ITRC training courses • Plays an active role in future project selection • Takes ITRC training courses
Benefits to the Private Sector • Cutting-edge information on innovative environmental technologies and approaches • Opportunities to author national guidance documents and participate in training courses • Insight into the regulatory world • Access to multiple state and federal government entities • Opportunity for broader review of technology • National approach to demonstration and deployment of new technology • Mechanism to identify and integrate regulatory performance expectations among states
How Can You Get Benefit From ITRC? • Download and use ITRC documents (www.itrcweb.org) • Take training (internet or classroom) • Join an ITRC team and help write documents and develop training courses • Contact your State POC through your state environmental agency
What Have We Learned? ITRC is a model organization for knowledge transfer – our approach works • There is interest in starting a Canadian version of ITRC • An ITRC-like organization has been recommended to implement RCRA Vision 2020 goals
What Have We Learned? • ITRC is a model federal-state partnership • Our consensus-based approach allows adversarial relationships to be replaced with collaboration • Hundreds of success stories showing ITRC benefit to federal funders and states are available • ITRC is frequently publicly referred to at federal-state meetings as a successful partnership
What Have We Learned? • Like many groups, we must do more with less • ITRC is using “lean” processes to make our work more efficient
Where Are We Going? ITRC must look at itself through a “21st century lens” • What type of new training technologies and approaches are possible? • What can we do to improve our website and make the most of social networking? • What emerging areas should we consider for projects within the cleanup area and outside of cleanup area?
Where Are We Going? Everyone in ITRC “does outreach” • ITRC provides basic tools, but members are responsible for outreach in whatever capacity they can provide. • Communication with commissioners/directors of state environmental agencies and federal funders is a high priority for ITRC leadership. • Look for outreach opportunities—if you need support let ITRC know. • An essential part of outreach is reporting back success stories so we can measure our impact.
What Do We Already Know? ITRC’s number one resource is its members, who dedicate their time and expertise to produce quality products.
National Guide for Vapor Intrusion • 32 states report use of ITRC’s Vapor Intrusion guidance document in at least one of the following ways: • As a basis to develop state guidance • As a reference within state guidance • As a tool to directly assist with site activities • As a resource for state staff and consultants/contractors • ITRC has trained over 4,600 people from across the nation on vapor intrusion (42% are state regulators)! “Since participating in ITRC Maine will likely adopt the ITRC vapor intrusion tech-reg as the default.” – Fred Lavallee, ME