This document outlines the current progress of the thermo-mechanical setup for the CLIC Vertex Thermal project as of August 26, 2013. It summarizes the assessment of various solutions for the stave prototype, with proposals for next steps. The production status includes the readiness of Bosh profiles, polycarbonate walls, and joints, with some components still needing machining. Key items such as fans and data acquisition systems are in place, while machining and assembly work remains to be completed. Future steps include final machining, integrating parts, and ensuring proper sensor supply.

kinsey
Télécharger la présentation

Overview of Thermo-Mechanical Setup Progress for CLIC Vertex Thermal Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Clic Vertex Thermal Setup 26/08/2013 Maxence CURDY CERN PH/DT/EO

  2. Overview • Thermo-mechanical setup progress. • Stave prototype: assessment of different solutions tested, proposal for next steps.

  3. Production status Infrastructure: - Bosh profiles: Ok. - Polycarbonate walls: Machining. - Joints: Ok. - Junction rectangle/cylinder: Ok. - Small mechanical parts: Machining. - Fan: Ok. - Flow Meter: Ordered. - Data Acquisition (DAQ): Ok. Everything has been stored in the building 187

  4. Bosh profiles

  5. The Turntable

  6. Fan + cone It's just assembled for the picture, not mounted.

  7. What remains to be done ?- Machining last parts. - Machining /assembly the box. - Water jet cutter  wait the plate for welding the cone.- Supply the fan.- Assembling all setup. - Heaters Contact with MINCO or Wolfgang. - Ordered Pt1000 sensor Farnell or Radiospares.- Stave fixation. Production status

  8. Stave 3 4 5 6 7 8 Weight for 280mm  6.7g 3.5g 2.38g 3.08g 2.77g 1.51g