This document outlines the current progress of the thermo-mechanical setup for the CLIC Vertex Thermal project as of August 26, 2013. It summarizes the assessment of various solutions for the stave prototype, with proposals for next steps. The production status includes the readiness of Bosh profiles, polycarbonate walls, and joints, with some components still needing machining. Key items such as fans and data acquisition systems are in place, while machining and assembly work remains to be completed. Future steps include final machining, integrating parts, and ensuring proper sensor supply.
E N D
Clic Vertex Thermal Setup 26/08/2013 Maxence CURDY CERN PH/DT/EO
Overview • Thermo-mechanical setup progress. • Stave prototype: assessment of different solutions tested, proposal for next steps.
Production status Infrastructure: - Bosh profiles: Ok. - Polycarbonate walls: Machining. - Joints: Ok. - Junction rectangle/cylinder: Ok. - Small mechanical parts: Machining. - Fan: Ok. - Flow Meter: Ordered. - Data Acquisition (DAQ): Ok. Everything has been stored in the building 187
Fan + cone It's just assembled for the picture, not mounted.
What remains to be done ?- Machining last parts. - Machining /assembly the box. - Water jet cutter wait the plate for welding the cone.- Supply the fan.- Assembling all setup. - Heaters Contact with MINCO or Wolfgang. - Ordered Pt1000 sensor Farnell or Radiospares.- Stave fixation. Production status
Stave 3 4 5 6 7 8 Weight for 280mm 6.7g 3.5g 2.38g 3.08g 2.77g 1.51g