1 / 16

Special Device Review 09-10 (Device Name)

Special Device Review 09-10 (Device Name). Prepared by: (Name) Rev(1) MM/DD/YY. Deployed Configuration (Sketch). Description of Deployed Hardware (Include IceCube Hole #s and Depths). Drill Order (IC Hole #): Weight and name of unit to be deployed Depths and/or breakouts

Télécharger la présentation

Special Device Review 09-10 (Device Name)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Special Device Review 09-10 (Device Name) Prepared by: (Name) Rev(1) MM/DD/YY

  2. Deployed Configuration(Sketch)

  3. Description of Deployed Hardware(Include IceCube Hole #s and Depths) • Drill Order (IC Hole #): • Weight and name of unit to be deployed • Depths and/or breakouts • Deployment type (attached to IC cable?) • Description of any downhole cables • Description of any surface electronics • Description of any surface cabling

  4. Objectives/Science Goals • Measurement (s) to be taken • Type of data to be acquired • etc • etc

  5. Materials & People needed for Deployment at each hole • Equipment needed for each deployment • Materials needed for each deployment • People (w/ on ice dates) for each deployment

  6. Delivery Milestones • Finish Instrument Production at (location) • Target date • Finish Testing of (equipment) at (location) • Target date • Ship from source location to destination location • Target date • ROS • week ending (date) (ROS date xxxx) • On Ice Testing • Week ending MM DD • First Deployment • MM DD

  7. NH Testing Overview • Functional tests of (equipment) • Test1 (results) • Test2 (results) • System Testing (e.g. at PCTS) • Test 1 (results) • etc

  8. SP Testing Overview • Visual inspection of shipped hardware • Functional testing • System Testing

  9. Interfaces to IceCube(show all connectors and pinouts) • Any connections to IC system • Signaling format (analog, DSL Modem, DOM format, etc) • List & diagram connectors and patch cables Diagram showing connectors and pinouts of connection to IC system

  10. IceCube CompatibilityDescribe (T)ests or (A)nalysis • Verify no harm to IceCube hardware: • Test or Analysis 1 • Test or Analysis 2 • Verify no disruption to IC timing or comms: • Test or Analysis 1 • Test or Analysis 2 • etc

  11. ICL Impact • New Equipment needed in ICL • Modifications to existing ICL equipment • Patch cables needed in ICL

  12. Logistics • ROS Date • week ending MM DD (ROS date xxxx) • Ship Date/From/To/Who receives • (name) to ship from (place) on MM DD • (name) to Receive at Pole • Shipping Method • Method (verify with Terry H.) • Weights & Dimensions of packages • #Boxes, weights, approx sizes

  13. Deployment Plan(Basic steps) • Step1 • Step2 • etc

  14. Potential Safety Hazards/ Mitigation • Risk 1 • Mitigation for Risk 1 • Risk 2 • Mitigation for Risk 2

  15. Operational Plan • How often/when will it operate. Who controls it? • How do you get data from / to it ?

  16. RPSC Support • Any anticipated RPSC support needed

More Related