Development of a Computerized Bridge Management System in Wales: Key Updates and Frameworks
This document outlines the ongoing developments related to the computerized bridge management system being implemented in Wales. It includes insights into the pilot demonstration initiated by the Welsh Assembly Government in October 2004, the establishment of key performance indicators by the Highways Agency, and the introduction of an asset valuation model for highway structures. Additionally, it discusses the draft Code of Practice for managing highway structures, shared with the Steering Group in November 2004, and the Condition/Funding Projection Model prepared in collaboration with LoBEG and TfL by March 2005.
Development of a Computerized Bridge Management System in Wales: Key Updates and Frameworks
E N D
Presentation Transcript
On-Going Developments • Development of a Computerised Bridge Management System for Wales – Pilot for demonstration • Welsh Assembly Government • October 2004 • Key Performance Indicators • Highways Agency and CSS • October/November 2004 • Asset Valuation Model for Highway Structures • Highways Agency • November 2004
On-Going Developments • Code of Practice for the Management of Highway Structures and Framework for a BMS • DfT and Bridges Board • First Draft to Steering Group on 1st November • March/April 2005 • Condition/Funding Projection Model • LoBEG and TfL • March 2005