30 likes | 138 Vues
This document presents an analysis of the Tuco 345/230 kV Transformer Circuit 2 and the Stateline 345 kV Circuit 1 (SPS). It details the estimates made at the time of Modified NTC issuance for evaluating the operational performance and reliability of the interconnected systems. The aim is to provide insights into the balance and efficiency of the energy portfolio, ensuring optimal functioning within the electric grid. Emphasis is placed on the significance of these estimates for future planning and system upgrades.
E N D
Tuco 345/230 kV Transformer Ckt 2 (SPS) *SPS estimate at time of Modified NTC issuance