Louisville Fire Protection District Fleet Maintenance and Training Complex 2095 Boxelder Street

Louisville Fire Protection District Fleet Maintenance and Training Complex 2095 Boxelder Street. Special Review Use – December 18, 2012 Case 12-026-UR. Agenda :. Project Introduction – Slide Presentation Review the RFP Questions Building walk through – 1245 Main Street – Fire Station 1

kohana
Télécharger la présentation

Louisville Fire Protection District Fleet Maintenance and Training Complex 2095 Boxelder Street

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Louisville Fire Protection DistrictFleet Maintenance and Training Complex2095 Boxelder Street Special Review Use – December 18, 2012 Case 12-026-UR

  2. Agenda : • Project Introduction – Slide Presentation • Review the RFP • Questions • Building walk through – 1245 Main Street – Fire Station 1 • Site visit 2095 Boxelder

  3. Location: Downtown Via Appia 2095 Boxelder Street HWY 36 DILLON/95th NW PARKWAY

  4. Location: 104th Boxelder

  5. The Built Elements: • The Project – Five elements: Fire Station (Primary Building) Vehicle storage and maintenance, staff, emergency personnel, training room Training Building Live exercises, rescue training, burn room, event management Shade Structure Exterior training / staging Fueling / Trash Enclosure Storage of 1,000 gallons fuel in engineered above-ground holding tank Trash Enclosure Burn debris, general waste This tank complies with the requirements of SwRI Test Procedure 95-03, 93-01, UFC 79-7, UL-2085, Interstitial Communication Test, and is a recognized listed product by Southwest Research Institute, San Antonio, Texas.

  6. Site Plan :

  7. Phasing Plan : Phase 1 Landscape and Site Improvements Trash Enclosure Shade Structure Training Building Site Paving Access Gates Trash and Fuel Enclosure Access Gates Parking Areas Parking Areas Monument Sign

  8. Phasing Plan : Phase 2 New Fire station with (3) bays, training room, office, vestibule Complete Landscape and Site Improvements Complete Landscape and Site Improvements Shell second floor interior

  9. Phasing Plan : Phase 3 Finish upper floor interior improvements

  10. Schedule : • Planning Approvals Special Review Use – Approved PUD – 01/10/2013 -04/19/2013 • Architecture and Engineering 02/1/2013 – 05/15/2013 • Detailed Construction Cost / Bidding RFP February 2013 Design Assist / GMP March - April • Construction 04/30/2013 – 02/2014

  11. Contact Information : • Fire Chief Tim Parker tparker@louisvillefire.com • Architecture and Engineering Kyle Callahan kyle@kylecallahan.com • Training Structure Steve Harms – Fire facilities sharms@firefacilities.com

  12. Questions ? Kyle Callahan & Associates, Architecture kyle@kylecallahan.com 303-545-2007