Statistical Critical Path Selection for Timing Validation

DESCRIPTION

Statistical Critical Path Selection for Timing Validation. Kai Yang, Kwang-Ting Cheng, and Li-C Wang Department of Electrical and Computer Engineering University of California, Santa Barbara. Outline. Abstract Background Motivation Universal Representative Path Set

1 / 32

Télécharger la présentation

Statistical Critical Path Selection for Timing Validation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Statistical Critical Path Selection for Timing Validation Kai Yang, Kwang-Ting Cheng, and Li-C Wang Department of Electrical and Computer Engineering University of California, Santa Barbara

  2. Outline • Abstract • Background • Motivation • Universal Representative Path Set • Statistical Timing Simulator • UR-Path Construction • Experimental Result • Conclusion and Future Works

  3. Outline • Abstract • Background • Motivation • Universal Representative Path Set • Statistical Timing Simulator • UR-Path Construction • Experimental Result • Conclusion and Future Works

  4. Abstract Statistical critical path selection for timing validation • Path selection aims at tolerating inaccurate timing models • Develop an efficient statistical timing simulator which can model both intra-die and inter-die process variation • Analyze the timing validation quality using the generated patterns for the selected paths • Previous researches utilize static path analysis

  5. Outline • Abstract • Background • Motivation • Universal Representative Path Set • Statistical Timing Simulator • UR-Path Construction • Experimental Result • Conclusion and Future Works

  6. Background • Continuous shrinking of device feature size increases the following timing effects: • Process Variation • Power Noise • Crosstalk • Random Defects • Thermal Effects • Modeling Issue • Traditional discrete-value timing models are no longer effective • Statistical timing modeling make more sense in deep sub-micron domain

  7. Background – Timing Validation A B C • Verify the design with the timing constraints • Functional pattern v.s. structure-based pattern • Focus on the impact of process variations • No target on spot defects • Structure-based pattern • Critical path selection for timing validation • Test pattern generation for selected path set

  8. Outline • Abstract • Background • Motivation • Universal Representative Path Set • Statistical Timing Simulator • UR-Path Construction • Experimental Result • Conclusion and Future Works

  9. Motivation • Traditional discrete-value modeling not able to efficiently capture deep sub-micron timing effects • Even with a statistical methodology, an accurate timing model may not be available during the design phase • Even with an accurate timing model, the number of selected critical paths for timing validation may be huge

  10. Outline • Abstract • Background • Motivation • Universal Representative Path Set • Statistical Timing Simulator • UR-Path Construction • Experimental Result • Conclusion and Future Works

  11. Universal-Representative Path • Definition: Universal-Representative Path Set (UR) • If we make sure the delays of these paths are less than a • given clock period, then we can guarantee that the worst- • case circuit timing is also less than the clock period.

  12. Factor Analysis v.s. UR-Path Statistical Timing Simulation Statistical Timing Simulation  regression ATPG ATPG Representative paths reduced to 3 factors regression Path Selection 6 aspects in your questionnaire Identify the underlying structure of data matrix Y=function of (3 factors)  Y’=function of (6 variables) Factor Analysis

  13. Outline • Abstract • Background • Motivation • Universal Representative Path Set • Statistical Timing Simulator • UR-Path Construction • Experimental Result • Conclusion and Future Works

  14. Statistical Timing Simulator - DSIM • Objective: build a flexible, accurate, and efficient timing simulator • Support flexible interface for incorporating different DSM timing effects • Inter-Die Process Variation • Hierarchical Intra-Die Process Variation Modeling • Allow us to study the impact of process variations • software released ! • Download source code at http://cadlab.ece.ucsb.edu

  15. Statistical Timing Simulator Statistical Delay Library Layout Information Intra-Die Process Variation Profile Delay Random Variables Statistical Timing Simulator -- DSIM Simulation Patterns Circuit Netlist Sample 1 Sample 2 Sample K ….. Delay 1 Delay 2 Delay K

  16. Experimental Result and Efficiency Statistical Simulation Efficiency – 100 samples and 1000 random patterns – P4 2GHz Linux workstation

  17. Intra-Die Process Variations • Process variation can be divided into two categories • Inter-Die Variation • Intra-Die Variation • Inter-die variation is more likely to be random • Modeled in the statistical delay library • Intra-die variation is spatially correlated which is hard to directly modeled into the delay library • Proximately-close devices may have similar behaviors

  18. Hierarchical Intra-Die Process Variation Modeling • Originally developed by David Blaauw’s group on channel-length modeling • Each region is associated with a variation parameter Cn • Cn characterize the change in standard deviation C10 Example C20 Proximity-closer devices have a stronger correlations in theirs delay C30 Layout

  19. Impact of Modeled Intra-Die Process Variation • Layout Information – UCLA Capo • Without real process variation profile, randomly setup Cn • For each region, the change of accumulative std in percentage is less or equal to 15% • 3000 critical path delay test patterns with 6 different variation profiles

  20. Summary of DSIM clk • Each circuit sample has a different but fixed delay configuration • Given a set of patterns, the simulator performs timing simulation on each circuit sample • For a given clock and for each pattern, the simulator can compute the probability of circuit delay exceeding the clock • Consider the effect of intra-die process variations into timing simulation process Primary Output

  21. Outline • Abstract • Background • Motivation • Universal Representative Path Set • Statistical Timing Simulator • UR-Path Construction • Experimental Result • Conclusion and Future Works

  22. UR-Path Construction • Two-Phase algorithm • Path selection: • Select the superset of path (U-Path) from the whole path space which may affect the critical timing • Timing guard-band based selection method to tolerate inaccurate timing model • Path refinement: • Select the subset of path (UR-Path) from U-Path which can represent the timing behavior of the whole U-Path set

  23. Phase-1: Path Selection Δ A B C clk 333 clk- Δ 319 • Goal:timing guard-band based method to select the set of path which may affect the critical timing • Construction of U-Path [iccad2002] • Given a clock clk and the threshold value Δ, U-Path includes all paths with non-zero critical probabilities to exceed the specified value clk- Δ. • For a large Δ will produce a large number of paths which will make the path selection very inefficient.  Path Refinement c5315 c5315

  24. Phase-2: Path Refinement circuit sample Identify the path p has the largest critical probability circuit sample DSIM Remove those samples which p is longer than clk circuit sample For the remaining circuit samples, select the path with the largest critical probability, estimated based on all remaining samples circuit sample • Goal:Select a small set of path which can represent the timing behavior of U-Path • Timing behavior: the possibility to be longer than the clk Sample-based method [iccad2002]

  25. Phase-2: Path Refinement Remaining paths sorted with mean delay UR-path set Pick one path p’ can calculate the correlation coefficient with each path in UR-set After phase-1, we get a set of UR-path but due to the inaccurate timing model, we need to enlarge the path set • Correlation based heuristic – statistical factor analysis • Select the paths which are more independent • Paths with high correlation tend to have similar timing behavior If the correlation is less than the given threshold value, include p’ into UR-path set

  26. Outline • Abstract • Background • Motivation • Universal Representative Path Set • Statistical Timing Simulator • UR-Path Construction • Experimental Result • Conclusion and Future Works

  27. Experimental Setup • Incorporate the statistical simulator to calculate the failing sample rate as the evaluation metric • Perform the proposed path selection with inter-die process variation only • Modeled directly in the statistical delay library • Evaluate the quality of the resulting pattern of the circuit samples with both intra-die and inter-die process variations • To demonstrate the proposed method can tolerate the inaccurate timing model

  28. Metric: Failing Sample Rate Detected Failing Sample Rate = Detected Not-Detected + Statistical Timing Simulator Circuit Instance with both Inter-die and Intra-die variations Test set T Cause delay Exceeding clock? yes no Not-Detected Detected

  29. Experimental Result • Construct UR-Path set with different correlation coefficient • Compare with other path selection strategies • The number of selected critical path converge quickly compare to the traditional selection methodology Ind32opt

  30. Experimental Results c2670opt

  31. Outline • Abstract • Background • Motivation • Universal Representative Path Set • Statistical Timing Simulator • UR-Path Construction • Experimental Result • Conclusion and Future Works

  32. Conclusions and Future Work Conclusion • Propose a sample-based strategy to select statistical critical paths for timing validation. Experiment shows that the number of selected path converge quickly. • For some circuits, the proposed sampled-based method is much more efficiency than the traditional critical path selection. • Develop an efficient statistical timing simulator which can simulate both intra-die and inter-die delay. Future Work • Theoretically analyze the path selection problem for timing validation • Incorporate real process variation profiles to evaluate the proposed methodology