1 / 16

MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011

MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011. m +. m -. n. Motivation & Overview Steve Geer Accelerator R&D Vladimir Shiltsev Physics & Detector Studies Ron Lipton. DECISION TREE. Pierre Oddone. MOTIVATION.

kovit
Télécharger la présentation

MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011 m+ m- n Motivation & Overview Steve Geer Accelerator R&D Vladimir Shiltsev Physics & Detector Studies Ron Lipton

  2. DECISION TREE Pierre Oddone Steve Geer FNAL W&C 24 February, 2011

  3. MOTIVATION • If we can build a muon collider, it is an attractive multi-TeV lepton collider option because muons don’t radiate as readily as electrons (mm / me ~ 207): • - COMPACT Fits on laboratory site • - MULTI-PASS ACCELERATION • Cost Effective operation & construction • - MULTIPASS COLLISIONS IN A RING (~1000 turns) Relaxed emittance requirements & hence relaxed tolerances- NARROW ENERGY SPREADPrecision scans, kinematic constraints • - TWO DETECTORS (2 IPs)-DTbunch ~ 10 ms … (e.g. 4 TeV collider) • Lots of time for readout Backgrounds don’t pile up • -(mm/me)2= ~40000 • Enhanced s-channel rates for Higgs-like particles A 4 TeV Muon Collider wouldfit on the Fermilab Site COST PHYSICS Steve Geer FNAL W&C 24 February, 2011

  4. ENERGY SPREAD Beamstrahlung in any e+e- collider E/E  2 Steve Geer FNAL W&C 24 February, 2011

  5. PRECISION SCANS Lucie Linssen, SPC, 15/6/2009 ENERGY SCAN m+m-with ISR+BStr (Eichten) e+e- with ISR e+e- with ISR+BStr Steve Geer FNAL W&C 24 February, 2011

  6. CHALLENGES • Muons are produced as tertiary particles. To make enough of them we must start with a MW scale proton source & target facility. • Muons decay  everything must be done fast and we must deal with the decay electrons (& neutrinos for CM energies above ~3 TeV). • Muons are born within a large 6D phase-space. For a MC we must cool them by O(106) before they decay  New cooling technique (ionization cooling) must be demonstrated, and it requires components with demanding performance (NCRF in magnetic channel, high field solenoids.) • After cooling, beams still have relatively large emittance. Steve Geer FNAL W&C 24 February, 2011

  7. MUON COLLIDER SCHEMATIC √s = 1.5 TeV Circumference = 2.75 kmL = 1×1034cm-2s-1m/bunch = 2x1012 s(p)/p = 0.1% eN = 25 mm b * = 1cm Proton source: Upgraded PROJECT X (~4 MW, 2±1 ns long bunches) 1021muons per year that fit within the acceptance of an accelerator Steve Geer FNAL W&C 24 February, 2011

  8. Muon Collider cf. Neutrino Factory NEUTRINOFACTORY MUONCOLLIDER In present MC baseline design, Front End is same as for NF Steve Geer FNAL W&C 24 February, 2011

  9. PROGRESSOVER THE LAST DECADE • Successful completion of NF feasibility studies 1, 2, 2a, & International Scoping Study; launching of the ongoing International Design Study for a NF (IDS-NF). • Successful demonstration of the target technology (MERIT: Mercury jet in 15T solenoid hit by intense beam) • Conceptual development & simulation of a complete, self-consistent, muon cooling scheme (further conceptual development probably needed). • Built a unique accelerator R&D facility (MuCool Test Area) at end of FNAL Linac for testing cooling channel components. • Launching of MICE: international ionization cooling experiment at RAL. • First multi-TeVMuon Collider ring design & magnet concepts (to operate in decay background environment) • First detector background studies (10 years ago), & launching of 2nd generation of studies (now). Steve Geer FNAL W&C 24 February, 2011

  10. PROGRESS (continued) With a 4MW proton source, this will enable O(1021) muons/year to be produced, bunched, & cooled (by a factor O(10) ) to fit within the acceptance of an accelerator. 32m 57m 36m 100m Neuffer Palmer Have developed & simulated a self consistent cooling scheme that can yield the required O(106) cooling factor. Some of the components needed for these schemes are beyond state-of-art, require (bench-top-type) R&D, with perhaps some new inventions along the way. Steve Geer FNAL W&C 24 February, 2011

  11. THE MAP INITIATIVE IN THE U.S.(http://map.fnal.gov) • Oct 1, 2009 letter from Denis Kovar to FNAL Director: “Our office believes that it is timely to mount a concerted national R&D program that addresses the technical challenges and feasibility issues relevant to the capabilities needed for future Neutrino Factory and multi-TeVMuon Collider facilities. ...” • Letter requested a new organization for a national Muon Collider & Neutrino Factory R&D program, hosted at FNAL. MuonAccelerator Program Organization is now in place & functioning: 214 participants at birth from 14 institutions: • ANL, BNL, FNAL, Jlab, LBNL, ORNL, SLAC, Cornell, IIT, Princeton, UCB, UCLA, UCR, U-Miss • MAP R&D proposal reviewed August 2010 … committee concluded that the “proposed work was very important to the field of high energy physics.” Steve Geer FNAL W&C 24 February, 2011

  12. MUON COLLIDER “6 YEAR” R&D PLAN Deliver a Design Study to enable the community to judge the feasibility of a multi-TeVMC, including: (i) an end-to-end simulation of a MC complex based on technologies in-hand or that can be developed with a specified R&D program. (ii) hardware R&D and experimental tests to guide & validate the design work. (iii) Rough cost range. NOW MC Design Feasibility Study 7 MUON COLLIDER PROPOSAL 7. System Prototype 6 6. Sub-System Beam Tests 5 5. Semi-realistic sub-systems 4 4. Early sub-system Bench Tests 3 3. Component R&D 2 2. Technical Concept 1 1. Basic Idea Ring 6D Cooling Acceleration Final Cooling Initial Cooling Bunch / Phase Target & Dump Pre-Acceleration Steve Geer FNAL W&C 24 February, 2011

  13. ORGANIZATION/FUNDING EVOLUTION First ~10 years Now(FY10/11) FY07 – FY09 ≥FY11 NFMCC + MCTF NFMCC Interim MAP MAP ~4 M$ ~9 M$ ~10 M$ ~15 M$ (requested) Steve Geer FNAL W&C 24 February, 2011

  14. PARTICIPATION • Progress so far has been made by a combination of particle & accelerator scientists & engineers from labs & universities. • The ongoing R&D challenges include: • Understanding how to get high-gradient RF cavities operating in external magnetic fields (bench tests and beam tests). • Understanding how to make very high filed solenoids using HTS. • Designing, building & testing sections of an ionization cooling channel. • Simulating the accelerator complex & understanding the required component performance. • Simulating detector backgrounds and understanding detector requirements … inventing detector solutions as needed. • These activities provide opportunities to invent new things & make high-impact contributions. Steve Geer FNAL W&C 24 February, 2011

  15. http://conferences.fnal.gov/muon11/ Steve Geer FNAL W&C 24 February, 2011

  16. To learn more, feel free to contact any of us. Also: http://map.fnal.gov/ Accelerator R&D Vladimir Shiltsev Physics & Detector Studies Ron Lipton Steve Geer FNAL W&C 24 February, 2011

More Related