Construction Phase

Construction Phase. BULLDOG DRIVE. PROJECT LIMITS. PROJECT BENEFITS. Stormwater Improvements (reduce flooding of school site) Improve safety for vehicles and pedestrians. Shift main high school entrance west to alleviate back-ups into the bulldog drive/SR100 intersection.

krikor
Télécharger la présentation

Construction Phase

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Phase BULLDOGDRIVE

  2. PROJECT LIMITS

  3. PROJECT BENEFITS • Stormwater Improvements (reduce flooding of school site) • Improve safety for vehicles and pedestrians. • Shift main high school entrance west to alleviate back-ups into the bulldog drive/SR100 intersection. • Provide right turn lanes on SR100 onto Bulldog Dr. and high school entrances. • Provide turn lane on Bulldog for left turn into high school site. • Provide a 10-foot sidewalk along the west side of Bulldog Drive. • Reconstruction of Bulldog/SR100 intersection • Replace string pole signal with a new mast arm signal. • Roadway improvements for the ultimate configuration: • Right turn lane on bulldog onto SR100 and two left turn lanes onto SR100. • Extend existing left turn lane on SR100 onto Bulldog Drive. • Extension of street lighting. • Enhanced Landscaping and re-use irrigation.

  4. PROJECT PHASING • Short-Term vs. Long Term Needs Short Term: • Current Safety Issues • School Circulation • Intersection & Turning Movements (SR100 & Bulldog) • StormwaterIssues (Flooding) Long-Term: (Growth Not Occurring as Anticipated) • Additional Roadway Capacity • Solution = Phased Approach Phase 1: (Address Current Safety & Stormwater Issues) • School Circulation • Intersection & Turning Movements • Stormwater Issues Phase 2– (Address Capacity Issues) • 4 Lanes at Later Date – TBD

  5. PROJECT PHASING

  6. CITY COUNCIL ACTION • ConstructionInspection (CEI) Change Order • Stantec $ 263,630.08 • FPL Street Light Agreement (Not-To-Exceed) • Street Light Agreement $ 300,000.00 • ConstructionContract • P&S Paving $ 4,267,620.69 • Contingency $ 200,000.00

  7. CITY COUNCIL ACTION • Right-of-Way Map for Bulldog Drive

  8. CITY COUNCIL ACTION • Easement for Town Center CDD (2,077sf)

  9. CITY COUNCIL ACTION • Easement for FPL Utilities

  10. CRA Budget

  11. CONSTRUCTION PHASE FUNDING